EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 6, 2024 at 8:00 PM

Updated September 7, 2024

Site work and paving for a mixed-use development in American Canyon, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project consists of asphalt paving, ADA and other access improvements to the parking lot and trailhead on the Newell Open Space Preserve. Work includes, but is not limited to, mobilization, storm water pollution prevention, traffic control, concrete curb and gutter, sidewalk, driveway approach, pedestrian crossings, ADA improvements, AB trail, asphalt paving, and striping on the Newell Open Space parking lot in American Canyon. The Engineer's Estimate for the Project is $330,000. No bid will be accepted from a bidder who is not licensed in the State of California as a Class A License, (licensed in accordance with the provisions of Division 3, Chapter 9, of the Business and Professions Code of the State of California). The successful Contractor will be required to furnish, with the Agreement, a Faithful Performance Bond in the amount of one hundred percent (100%) of the Agreement price and a Payment for Labor and Materials Bond in the amount of one hundred percent (100%) of the Agreement price. The successful Contractor will be required to furnish, prior to issuance of a Notice of Completion, a Warrantee Bond in the amount of ten percent (10%) of the final Agreement price. The successful Contractor shall also furnish Certificates of Insurance evidencing that all insurance coverage required by the CONTRACT DOCUMENTS has been so secured. PREVAILING WAGES Prevailing wages are required on this Contract. The ENGINEER of the California Department of Industrial Relations determines the general prevailing wage rates. BID SECURITY All Contract Proposals shall be accompanied by a cashier's or certified check payable to the order of the City of American Canyon, amounting to ten per cent (10%) of the bid, or by a Bid Bond in said amount, on the form included within the Contract Proposal. Said check shall be forfeited, or said bond shall become payable, in case the Bidder depositing same does not complete the requirements as defined in the CONTRACT DOCUMENTS in the time set forth herein. The City Council reserves the right to reject any and all proposals, to waive any irregularities, and to award the contract to other than the lowest Bidder. No Bidder may withdraw their Contract Proposal for a period of sixty (60) days after the bid opening. Copies of the CONTRACT DOCUMENTS may be examined or obtained at the stated address herein. MANDATORY REGISTRATION PROGRAM FOR PUBLIC WORKS PROJECTS Contractors must comply with the Department of Industrial Relations (DIR) compliance monitoring unit and labor compliance program. Contractors are required to register before bidding on and entering into contracts for state and local public works projects. MANDATORY PROJECT LABOR AGREEMENT The successful Contractor will be required to agree to be a party to and be bound by the City of American Canyon Project Labor Agreement (PLA) for this project. Question Submission Deadline:August 29, 2024, 5:00pm Question Response Deadline:September 3, 2024, 5:00pm

Bid Results

Roads / Highways

$401,534.00

Public - City

Paving, Site Work

21

17

27

10

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Residential Furniture, Beds, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
91
Bidding Soon
2,006
All Active Projects
839
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 7, 2024

img_map_placeholder

7000 Newell Dr, American Canyon, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.