BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2024 at 8:00 PM

Updated September 25, 2024

Site work and paving for a bridge / tunnel in Sundance, Wyoming. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Description: Structure repair involving bridge and traffic control work at RM 205.90 at the Beulah Interchange between Sundance and the South Dakota State Line. Est. Completion Date: July 31, 2025 Pre-Qualification: Yes WYDOT - Call No. 002 - Sundance - South Dakota Line (Beulah Interchange)

Award

Bridges / Tunnels

$1,188,305.00

Public - State/Provincial

Paving, Site Work

67

6

10

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
14
Bidding Soon
236
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

November 11, 2024

Project location map

To Be Determined, Sundance, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.