BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Palm Bay, Florida. Completed plans call for site work for a water / sewer project.

PD Shooting Tower Repainting Any uncertainty regarding the time a Submittal is received will be resolved against the Firm. The City reserves the right to waive proposal informality or technicality and to accept or reject any or all bids. Deadline for Questions September 10, 2024 @ 5:00 PM BASE SCOPE - Exterior Stairwell Tower, Railing, North Side Doors, and Concrete Floor Prepare, prime, and repaint the exterior stairwell tower, railing, and north side doors as indicated on attached drawings and in accordance with product manufacturer recommendation. i. The primer shall be Sherwin Williams B58T00604 Macropoxy 646 Fast Cure Epoxy Part A or equivalent as approved by the Owner. ii. The paint shall be Sherwin Williams B65W00351 Hi-Solids Polyurethane Semi-Gloss or equivalent as approved by the Owner. iii. When priming is complete, the paint manufacture representative will perform a site visit to determine if specifications were followed prior to final approval to move forward with the finish coat. Prepare, crack fill, and paint the concrete floor as indicated on the attached drawings and in accordance with product manufacturer recommendation. iv. Preparation shall follow manufacturer preparation instructions, which include, but are not limited to, removing all oil, grease, and loose material prior to crack filling and painting. v. The crack filler shall be 100167303 Miracle Bond Easy Flow Repair Epoxy or equivalent as approved by the Owner. vi. The paint shall be 2-coat application of Sherwin Williams B65A00060 ArmorSeal(R) Rexthane I Floor Coating, with 01273754 Rhino Hide Coarse Anti-Slip Additive or equivalent as approved by the Owner. vii. Each surface shall be cleaned and prepared as specified. The painting contractor is responsible for the finish of his work. Should any surface be found unsuitable to produce a proper paint or sealant finish, the project representative shall be notified, in writing, and not materials shall be applied until the unsuitable surfaces have been made satisfactory. Commencing of work in a specific area shall be construed as acceptance of surfaces and thereafter as fit and proper to receive finish. Contractor shall be fully responsible for satisfactory work.

Award

Water / Sewer

$89,056.00

Public - City

Site Work

8

9

9

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
42
Bidding Soon
855
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

October 31, 2024

img_map_placeholder

To Be Determined, Palm Bay, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.