BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Demolition, site work and addition to a municipal facility in Palmer, Alaska. Conceptual plans call for the addition of a 17,000-square-foot municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.

As of September 4, 2025, a design firm has been selected for the project. Bidding is estimated to take place in February of 2025. *The closed solicitation has been included below for reference: The construction budget is $35 million. The Alaska Court System is soliciting bids via a Request for Proposal for full design of the Palmer Courthouse to include construction documents and project support. The purpose of this project is to expand the Palmer Courthouse to provide additional courtroom space, associated judicial office space, clerk's office space, and security screening area. Alaska Court System (ACS) has already completed a preliminary design that has been approved by ACS Leadership. The project aims to add roughly 30,000 sf of space on the current property as well as upgrade the site. The site upgrades will include additional secure parking for ACS Judicial Officers and staff, creation of additional public parking where available, exterior lighting, and landscape The ACS is looking for a full design to include all applicable disciplines with several review periods at 35%, 65%, and 95%. In addition, the ACS will require assistance with preparation of construction documents for the purposes of bidding, participation in the bid process, construction administration throughout the duration of the project, participation in project meetings, and assistance with close out activities. This will be a multi-year multi-phased project. A schematic of the preliminary design shall be provided at the Pre-Bid Meeting. All questions, concerns, or clarification requests must be emailed to Anna Harrison at aharrison@akcourts.gov Anticipated start date is November 1, 2024, and will be a multi-year project depending on when funding is issued by the Alaska Legislature. Full design should be completed no later than May 15, 2025. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

$35,000,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
148
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

Project location map

435 S Denali St, Palmer, AK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.