BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in River Grove, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

City/County River Grove Contract #1 The Removal and Replacement of Pavement Concrete Base and Hma Surface Patches and Necessary Structure Adjustments Project Location: Various Locations throughout the Village of River Grove Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Removal and Replacement of Pavement Concrete Base and HMA Surface Patches Removal and replacement of concrete base course, HMA surface patching, and structures adjustments throughout the village of River Grove. This Contract provides for replacing sections of surface pavement and roadway patches on Village Streets, as directed by the Director of Public Works or the Engineer. The Contractor will NOT be permitted to remove concrete patches that cannot be replaced during the same calendar week. The Contractor will be given specific locations of work to be done upon award and approval of the Contract. On completion of the work, the Engineer will be required to give an accounting of quantities and locations to the Illinois Department of Transportation at Schaumburg. Work shall start within 2 weeks of the execution of the Contract. The Village will provide the Contractor with a list of work locations by street address and quantity of work. The limits of work will be marked by the Village or will be evident by the description on the work list. In the event the work is neither marked nor evident, the Contractor shall contact the Village for clarification. No work will be paid for in excess of the quantity shown on the list for each address unless authorized by the Village in advance of removal. The Contractor will be responsible for passing out construction notices to residents and posting temporary no parking signs 48 hours before work begins at all applicable locations. The Contract will remain open until the completion date. During the contract period, the Village will provide updated lists and new work locations as they become available. After the initial list of work is completed, the Contractor may schedule his work on the updated or new locations following an allowable suspension of work of up to 5 weeks.

Award

Roads / Highways

$59,998.00

Public - City

Paving, Site Work

6

4

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
89
Bidding Soon
1,792
All Active Projects
775
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 18, 2024

img_map_placeholder

Multiple Locations, River Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.