Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 9, 2024 at 8:00 PM
Updated September 10, 2024
Site work for a water / sewer project in Port Edward, British Columbia. Completed plans call for site work for a water / sewer project.
This project consists of the demolition and removal of a pile and deck structure in Porpoise Harbour. The Work generally consists of the following elements: 1. Demolition and removal of the following: Deck structure and metal container within red boundary shown in Appendix 8 - Photo – A8-1. Piles (approximately 100 piles in total). Preference is to pull piles and not cut off at mudline if possible. 2. Disposal of all materials in accordance with the BC Ministry of Environment and Climate Change Strategy standards and regulations 3. Work to be performed from water side only. 4. Contractor to deploy a boom around work area. 5. Contractor to provide all necessary permits and insurances 6. Contractor to provide schedule and execution, safety and environmental management plan. Environmental Management plan to be prepared by a qualified professional with reference to Fisheries and Oceans Canada (“DFO”) guidance for Working Near Water. 7. All debris, including but not limited to residual cuttings and sawdust, must be captured above water. Any debris that enters the water must be skimmed and or water vacuumed. 8. All work to be performed outside of nesting and fisheries windows. Documents can be obtained from www.bcbid.gov.bc.ca
Post-Bid
Water / Sewer
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 6, 2024
November 1, 2024
Porpoise Harbour, Port Edward, BC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
