Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in La Mesa, New Mexico. Conceptual plans call for site work for a water / sewer project.
A pre-proposal meeting will not be held. Interviews will not be held for this project after the evaluation of proposals is completed. This project is recommended by the LRGPWWA Water Master Plan, and Bohannan Huston, Inc. is currently engaged under an LRGPWWA funded On-Call Task Order to prepare a Design Analysis Report PER and environmental clearance documents for for the project components in public ROW, and to acquire NM SLO and BLM ROW permits. PER and environmental documents may need to be expanded depending on funding sources for the project. The LRGPWWA has been allocated Congressionally Directed Spending to be applied for as a US EPA Community Grant, and a Water Trust Fund application is pending for the project. The goal of the project is to transition LRGPWWA's water sources out of the Mesilla Valley floor away from agricultural lands and onto the west mesa near Afton Road identified in the Well Siting Study of the LRGPWWA Water Master Plan in order to delay the impacts of LRGPWWA water pumping/usage on the Rio Grande in order to minimize conflicts with other water users. The Phase I Project will include construction of a new well and well-house, 14,100' of 8" water transmission pipeline along Afton Road, 10,500' of 10" water distribution pipeline along Afton Road, a new 20,000 gallon wellfield staging tank, electric service installation, SCADA equipment, and all necessary appurtenances. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$200,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to five free projects and companies, then subscribe for complete access to all contacts and documents. Unlock new opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 3, 2025
To Be Determined, La Mesa, NM
Related To This Project
La Mesa, NM
Bid Date: Oct 22 2024
La Mesa, NM
Bid Date: Mar 27 2024
La Mesa, NM
Bid Date: Dec 15 2023
La Mesa, NM
Bid Date: Nov 23 2021
La Mesa, NM
Bid Date: Aug 26 2022
La Mesa, NM
--
Lower Rio Grande Public Water Works Authority East Mesa Water System Improvements, Phase 1 - 4792998
La Mesa, NM
Bid Date: May 21 2024
Gallup, NM
Bid Date: Sep 12 2024
Las Cruces, NM
Bid Date: Sep 24 2024
Raton, NM
Bid Date: Sep 05 2024
Las Vegas, NM
Bid Date: Aug 19 2024
Santa Fe, NM
Bid Date: Sep 13 2024
OT-10 Area Environmental Care Plan, Kirtland Air Force Base, Bernalillo County, New Mexico - 5515158
Albuquerque, NM
Bid Date: Aug 26 2024
Las Vegas, NM
Bid Date: Sep 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--