EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 13, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Dunmore, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of September 13, 2024, the project was awarded to Pennsy Supply , with an awarded amount of $538,910.95. Borough of Dunmore 2024 Paving Project The Project consists of sawcutting, bituminous pavement base replacement, full width milling, bituminous overlay, full depth pavement replacement of the streets designated on the associated drawings. The bid must be accompanied by a certified/cashiers check or Bid Bond in the amount of ten percent (10%) of the bid amount, made payable to The Borough of Dunmore. The Borough reserves the right to reject any or all bids or portions thereof or to waive any informalities in the bidding. If written notice of the acceptance of this Bid is mailed or delivered to the successful bidder within ten (10) days after the opening thereof, or at any time thereafter before the Bid is withdrawn, the said bidder agrees to execute and deliver the Project Agreement in the form prescribed by the Borough or forfeit said Bid Bond. The contract documents contain requirements regarding nondiscrimination in hiring practices, and related matter, including performance and payment bonds and liability insurance. The Borough of Dunmore is an Equal Opportunity Employer and all qualified Bids of contractors will receive equal consideration without regard to Race, Color, Religion, Creed, Ancestry, National Origin, Gender or Sexual Orientation.

Award

Roads / Highways

$538,910.00

Public - City

Paving, Site Work

7

9

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
141
Bidding Soon
1,591
All Active Projects
742
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 7, 2024

img_map_placeholder

Multiple Locations, Dunmore, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Borough of Dunmore 2024 Paving Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.