BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a retail development in Naples, Florida. Completed plans call for the renovation of a retail development.

Hurricane Ian Repairs - Caxambas Ship Store It is recommended that bidders visit site and verify quantities. Clean up the interior of the ship store, removing and disposing of any leftover debris. Apply microbial to floor and walls to clean/disinfect/kill mold spores and smell in the blocks. Clean A/C ducting to abandon odors and mildew in ducts and change out all filters. Install (8) EA new 2' x 4' LED Commercial Ceiling Lights (6 in the main room, 1 in each storage area). Color shall be white. Install (1) EA new four space commercial sink including plumbing tying into existing plumbing line and installing p-trap and drain. Install approximately 715 SF of non-porous porcelain floor tile. Install standard 12x12 porcelain floor tile w/max. 1/2 " grout line. Color to be white or off-white selected from manufacturer's standard range. Coefficient of friction must comply with ADA and Code Requirements for dry and wet conditions. Prepare floor as directed by manufacturer prior to installing Foundation DX 5000 or equal to create a smooth, waterproof floor surface. Install approximately 130 LF of 6" vinyl cove base. Color to match floor tile. Apply PVA primer and paint all walls, approximately 960 SF. Paint shall be moisture resistant such as Sherwin Williams Pro Industrial pre-catalyzed water-based epoxy, or equal. Color basis of design: SW 7009 "Pearly White" in semi-gloss. Provide primer and 2 finish coats minimum. Install 800 SF of 2x2 ACT drop ceiling and grid (includes 2 storage areas in rear of store). Include installation of R30 insulation. Install new countertop/desk area for POS system. POS system will be supplied by others and ties to the fuel system. Install 1 EA new window on east side of building which became dislodged during storm and is now broken. Window shall be impact-resistant, low E, turtle film PGT 770 series. Window is 44" x 45". Frame color shall match existing. Install 2 new harbor breeze ceiling fans, 5 blades. Contractor shall be responsible for permitting and any associated required documentation. Jurisdiction having authority is City of Marco Island. Summary The ship store at Caxambas Marina was damaged from Hurricane Ian. The damages to the interior of the ship store resulted from high winds and flooding. The interior was partially demolished with some debris left behind. The store has been closed since the Hurricane and will remain so until the repairs are complete. There are two other projects ongoing at the Marina presently. One to replace the fuel system and another separate project to repair the seawall and its surroundings. Background The ship store at Caxambas Marina was damaged from Hurricane Ian. The damages to the interior of the ship store resulted from high winds and flooding. The interior was partially demolished with some debris left behind. The store has been closed since the Hurricane and will remain so until the repairs are complete. There are two other projects ongoing at the Marina presently. One to replace the fuel system and another separate project to repair the seawall and its surroundings. The Facilities Management Division (hereinafter, the "Division or Department") has issued this informal competition Quick Quote (hereinafter, "QQ") with the intent of obtaining quotes from interested vendors in accordance with the terms, conditions and specifications stated or attached. The vendor, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated. The purchase order term, if an award is made is intended to be for a one-time purchase. Prices shall remain firm for the term of the resultant purchase order. No Exceptions to the County's Purchase Order Terms and Conditions Nor a Vendor Provided Contract Will Be Accepted. Surcharges will not be accepted in conjunction with this purchase order, and such charges should be incorporated into the pricing structure. All goods are FOB destination and must be suitably packed and prepared to secure the lowest transportation rates and to comply with all carrier regulations. Risk of loss of any goods sold hereunder shall transfer to the COUNTY at the time and place of delivery; provided that risk of loss prior to actual receipt of the goods by the COUNTY nonetheless remain with VENDOR. Question Deadline 08/30/2024 at 5:00 PM ET

Post-Bid

Retail

$49,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
22
Bidding Soon
277
All Active Projects
101
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2024

October 3, 2024

img_map_placeholder

To Be Determined, Naples, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.