BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2024 at 8:00 PM

Updated September 12, 2024

This is a service / maintenance or supply contract in Orillia, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000277963 Question Acceptance Deadline 2024/09/19 02:00:00 PM EDT evelopment of early works at the Huronia Regional Centre site in fiscal year 2024-25. TIMELINE: A Request For Proposals from architects to act as Prime Consultant has been issued by the Owner. The scope involves an analysis of what is required to facilitate the future development and completion of the necessary due diligence work to inform a design pertaining to the development of early works at the HRC site in fiscal year 2024-25. The scope of the Prime Consultants services is identified in Appendix C which will form Schedule A of OAA 600-2013 Contract of Architect Services The following requirements apply to all studies and are the responsibility of the proponent, including the Study Report Requirements in section 1.4: Comprehensive: The study shall be comprehensive in scope and include an investigation of all applicable building system elements to address all unknowns pertinent to any recommended future work. As studies are exploratory in nature, it is the responsibility of the proponent to advise the Owner if and when it becomes apparent that investigation of additional building system elements may be warranted beyond that stated in the original scope in order to comprehensively address all unknowns of interest to the study. Accurate: To ensure study findings are fully informed and accurate without errors or omissions, the proponent shall interview key facility personnel when conducting information gathering. Key personnel are those with any or all of historical knowledge of the site; knowledge of past changes, modifications, or repairs to the building system elements of concern; and understanding of or responsibility for day-to-day operations and/or maintenance of the building system elements of concern. The proponent shall solicit input from the Project Manager, Facility Manager, and Ministry representative (if applicable) on key personnel during the study kickoff meeting. The proponent shall subsequently provide a written list of all key personnel identified, showing the name of each individual, for review and approval by the Project Manager and stakeholders. The proponent is responsible to keep a record of all interviews conducted, to be made available on request. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Municipal

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
57
Bidding Soon
3,402
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

Project location map

700 Memorial Ave, Orillia, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.