BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2024 at 8:00 PM

Updated August 29, 2024

Site work and paving for a mixed-use development in Bedford Park, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Consists of storm sewer installation; hot-mix asphalt surface removal, preparation of aggregate bases, aggregate base construction, concrete curb and gutter removal and replacement, sidewalk removal and replacement, and driveway pavement removal and replacement, hot-mix asphalt surface and binder course paving; concrete pavement construction; structure adjustments; parkway restoration, pavement markings, and all appurtenant construction. Pre-Qualification: Yes

Bid Results

Sidewalks / Parking Lot

$569,502.00

Public - City

Paving, Site Work

51

9

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
451
Active Projects
250
Bidding Soon
3,311
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2024

September 25, 2024

Project location map

66th St, Bedford Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.