Published September 20, 2024 at 8:00 PM

Updated September 21, 2024

Demolition, site work, paving and new construction of a mixed-use development in Portland, Oregon. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Project Generally Includes Demolition, Reconstruction, New Construction and Resurfacing of the Existing Walking Trails Along Mt. Scott Creek to Comply With Existing Ada Standards. The Project Has Two Sections, a North Section, Commencing at the Intersection of Scott Creek Lane and 124th and Then Proceeding South to Terminate at Cedar Way and Adoline, and a Southern Section, Commencing at Southern Lites Park and Proceeding North to Terminate at Adoline. On the Southerly Section, the Project Includes Demolition and Refurbishing of an Existing Boardwalk. On the Northerly Section, the Project Includes Construction of a Poured in Place Concrete Ramp System Connected to Elevated Wood Boardwalk. The Project Includes Clearing and Grubbing, Tree Removal, Construction of Masonry Block Retaining Walls, Installation of Permeable and Non-permeable Hmac Paving Surfaces, and Site Restoration. Construction Must Be Completed No Later Than Wednesday, April 30, 2025. The City of Happy Valley May Reject Any and All Bids That Do Not Comply With Prescribed Public Bidding and Contracting Procedures and Requirements, Including the Requirement to Demonstrate the Bidder's Responsibility Under Orc 279c.375(3)(B), Award and Execution of Contract, and That the City of Happy Valley May Reject for Good Cause Any and All Bids After Finding That Doing So is in the Public Interest. Engineer's Estimate: $1.3 -$1.7 Mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions relating to the project shall be addressed by email, certified mail or telephone: Sally Curran, P.E., City Engineer, 503 886.8415, (sallyc@happyvalleyor.gov) or Bob Balgos, P.E., Senior Engineer, 503.886.8495, (bbalgos@happyvalleyor.gov)

Award

Roads / Highways

$1,615,500.00

Public - City

Demolition, New Construction, Paving, Site Work

45

7

2

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
49
Bidding Soon
1,049
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.