BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Norwich, Connecticut. Completed plans call for site work for a pipeline; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Natural Gas Distribution Infrastructure Safety and Modernization Gas Mains and Services Replacement Project Norwich Public Utilities (NPU) is soliciting quotes for the replacement of approximately 4.4 miles of natural gas mains and 245 associated gas services. There are three (3) general work areas included in the project: North Main Street (2.3 miles), McKinley Ave area (1.5 miles) and the Asylum Street area (0.6 miles). This project is 100% funded by the U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration (PHMSA), through the FY2022 Natural Gas Distribution Infrastructure Safety and Modernization Grant Program. The project budget is $9,329,000. If the lowest qualified bid amount and/or actual project expenses exceed $9,329,000 the project scope will be amended accordingly by NPU. The Contractor will be responsible for providing all required labor, material, and equipment to complete all work listed and specified herein. This work includes, but is not limited to: traffic control, saw cutting/zipping, trenching and spoils disposal, installation of high density polyethylene (HDPE) natural gas piping ranging in size from 1" to 8", pressure testing, installation of services, header/meter/regulator installation, connecting to customer piping, relighting customer appliances, coordination with customers to arrange for service installations, backfilling, compacting, temporary pavement repairs, permanent pavement repairs, full width milling and overlay (2"), line striping, traffic loop installation, concrete sidewalk repairs, installation of concrete traffic protection bollards, and landscaping and lawn re-establishment. Contractor shall photograph and/or record video pre-construction field conditions that shows condition of roads, sidewalks, line stripings, etc. Contractor shall provide NPU copies of photographs/video prior to the start of work. The method of pipe installation will be traditional excavation. NPU does not allow moling, boring, or direction drilling except in very limited circumstances, with prior approval, to protect historic or unique features that traditional excavation methods would be unable to preserve. All new mains and services installed under this project will be HDPE and the method of pipe joining will be butt fusion or electrofusion. There will be no mechanical fittings allowed to be used, including stab fittings. NPU crews will perform purge ins and purge outs as well as all connections of newly installed gas mains to existing gas mains unless otherwise negotiated with the Contractor. The Contractor shall provide crews with Northeast Gas Association (NGA) Operator Qualifications in accordance with the required tasks listed in the specifications. The Contractor shall comply with all 49 CFR Parts 199 and 40 regarding Drug & Alcohol Testing for all Covered Employees performing Covered Functions. The Contractors shall include in their bid copies or thorough descriptions of its Health and Safety Policies and Procedures, Quality Assurance Quality Control Policies and Procedures, Pipeline Safety Management Practices, and Company Training Policies and Procedures.

Award

Pipeline

$8,998,480.00

Public - City

Paving, Site Work

31

7

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
354
Active Projects
170
Bidding Soon
3,314
All Active Projects
1,395
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

November 18, 2024

img_map_placeholder

Multiple Locations, Norwich, CT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.