BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 5, 2024 at 8:00 PM

Updated October 6, 2024

Site work and paving for a civil project in Edina, Missouri. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The Project consists of the removal of the existing timber bridge deck, pressure washing the bridge superstructure, painting, repair of backwalls, rock blanket, a new reinforced concrete bridge deck, bridge railing, traffic control, and all other related items. Bidders must obtain their bid documents from Howe Company, LLC or Howe Company, LLC's website and be on the plan holders list to bid the project.

Bid Results

Bridges / Tunnels

$186,817.00

Public - County

Paving, Site Work

11

11

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
33
Bidding Soon
368
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2024

November 5, 2024

Project location map

Democrat Fill Ave, Edina, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.