BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2024 at 8:00 PM

Updated October 29, 2024

Site work for a water / sewer project in Madison, Alabama. Completed plans call for site work for a water / sewer project.

The installation of approximate- ly 12,800 feet of 16-inch ductile iron and HDPE water transmission main by open-cut, jack-and bore, and horizontal directional drill methods. The Owner requires the Project to be Substantially Completed within 210 Calendar days after the date when the Contract Time commences to run and completed and ready for final payment within 240 Calendar days after the date when the Contract Time commences to run. The attention of bidders is called to the provisions of State Law Governing General Contractors, as set forth in Title 34, Chapter 8,Article 1, Code of Alabama of 1975,as amended; and the provisions of said law shall govern bidders in of as it is applicable. The above-mentioned provisions of the Code make it illegal for the Owner to consider a bid from anyone who is not properly licensed under such code provisions. In addition, bidders must carry the Municipal and Utility classification as listed in the latest edition of the Roster of the State Licensing Board for General Contractors, Montgomery, Alabama. The Owner will not consider any bid unless the bidder produces evidence that they are so licensed. All nonresident contractors preparing bids shall submit with their bid, evidence of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. The attention of nonresident bidders is called to the provisions of Alabama Law, Title 39, Chapter 3,Code of Alabama 1975, as amended, whereby In the letting of public contracts in which any state, county, or municipal funds are utilized, except those contracts funded in whole or in part with funds received from a federal agency, preference shall be given to resident contractors, and a nonresident bidder domiciled in a state having laws granting preference to local contractors shall be awarded Alabama public contracts only on the same basis as the nonresident bidder's state awards contracts to Alabama contractors bidding under similar circumstances; resident contractors in Alabama, are to be granted preference over nonresidents in awarding of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident. **Bids will be rejected unless the Documents are obtained directly from the Engineer***

Award

Water / Sewer

$2,795,970.00

Public - County

Site Work

24

16

13

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
0
Bidding Soon
590
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

October 14, 2024

Project location map

Holladay Blvd, Madison, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.