BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2024 at 8:00 PM

Updated October 2, 2024

Site work for a water / sewer project in Saint Albans, West Virginia. Completed plans call for site work for a water / sewer project.

The Total Base Bid for each contract shall include all costs for furnishing labor and materials and performing all work set forth in the Contract Documents. The work to be bid upon is described as follows: Contract No. 1 - City of St. Albans MUC City Park 1.0 MG Water Storage Tank - The work consists of the construction of a 1,000,000- gallon glass fused to steel bolted water storage tank together with all related work as specified and shown on the Drawings. Contract No. 2 - City of St. Albans MUC 12Water Transmission Main - The work of this contract consists of the construction of approximately 5,000 L.F. of 12 PVC waterline, 1,700 L.F. of 8 PVC waterline, 120 L.F. of 6 PVC waterline, and 100 L.F. of 2 PVC waterline; gate valves; fire hydrants; meter reconnections; connections to existing lines together with all related work as specified and shown on the Drawings. Construction time limit for Contract No. 1 is 365 days. Construction time limit for Contract No. 2 is 365 days. All questions must be submitted in writing by 4:00 PM, on September 17, 2024, to allow for addenda, if needed. No questions after such date will be answered. Email all questions to Robert G. Belcher, PE, of Chapman Technical Group at gbelcher@chaptech.com. Only answers larifications provided via Addenda shall be binding as part of the Contract Documents. Bids shall be accompanied by a bid bond or a certified check in an amount equal to five percent (5%) of the bid to ensure the execution of the contract for which the bid is made. In case the bid is not accepted, the check or bid bond will be returned to the bidder, but if the bid is accepted and the bidder shall refuse or neglect to enter into a contract with the St. Albans Municipal Utility Commission within ten (10) days after the time he has been notified of the acceptance of his bid, the said check or bid bond shall be forfeited to the St. Albans Municipal Utility Commission for the failure to do so. No bidder may withdraw his bid for a period of sixty (60) days after closing time scheduled for the receipt of bids. The St. Albans Municipal Utility Commission reserves the right to waive informalities and to reject any and all bids.

Bid Results

Water / Sewer

$2,030,250.00

Public - City

Site Work

11

10

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
37
Bidding Soon
788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

October 24, 2024

Project location map

Multiple Locations, Saint Albans, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.