Site work for a playground / park / athletic field in Center Junction, Iowa. Completed plans call for site work for a playground / park / athletic field.
Remove and Burn All Designated Trees, Brush, and Woody Material on a 7 Acre Area of Central Park, In Addition to Grading. Complete 7 acres of tree removal and soil grading between October 15, 2024 and April 14, 2025 (Trees must be on the ground by March 31, 2025). 2. Remove all designated trees, root balls, brush, and woody material in designated area on project map, stack in piles, and burn (reference project map). No digging or operation of equipment within the drip line of trees marked to be saved. Roots on and protruding from the soil surface will be burned with the rest of the debris. Grade soil surface smooth and remove surface debris. 3. Start project by removing trees, root balls, brush, and woody material, and grading within 50 feet of the planned perimeter silt fence/silt log areas noted on the project map in the northwest and northeast sections of the project area (this will allow the Conservation Department to install silt fence/silt logs in these areas). 4. Depending on site conditions, weather, and speed of project completion, portions of the area may need to be completed (ie. tree, root ball, and root removal; burning, and finish grading) before moving on to undisturbed areas in order to appropriately stabilize the site and minimize soil erosion. The need for this will be determined by the Conservation Director or designated official. 5. Conservation Department employees will install mulch, seed, and erosion control devices. Damage to installed erosion control methods or materials by contractor and associated equipment will be replaced/repaired by the contractor. 6. At project completion the soil surface for the entire project will be smooth and free of root material laying on or sticking up from the soil surface. Stumps that remain after burning will be buried at the project site in areas designated by Jones County Conservation Staff. Depressions dug to bury stumps will have topsoil stripped and stockpiled, and then replaced on the surface of filled in depressions. 7. All burn piles must be located a sufficient distance from remaining live trees so that no heat or fire damage occurs to the live trees. Jones County shall issue sales tax exemption certificates through the Iowa Department of Revenue and Finance to the successful bidder and subcontractors to enable them to purchase qualifying materials for the project free of sales tax. Failure to execute a contract and file an acceptable Certificate of Insurance within 15 days of the date of the approval for awarding of the contract, as herein provided, will be just and sufficient cause for the denial of the award. All proposals must be filed on the forms furnished by the County, sealed and plainly marked. Proposals containing any reservations not provided for in the forms furnished may be rejected, and the Conservation Board reserves the right to waive technicalities and to reject any or all bids. Project Completion Date: April 14, 2025
Post-Bid
Playgrounds / Parks / Athletic Fields
$25,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 6, 2024
October 15, 2024
12515 Central Park Rd, Center Junction, IA
Related To This Project
Center Junction, IA
Bid Date: Dec 17 2024
Center Junction, IA
Bid Date: Aug 27 2024
Center Junction, IA
Bid Date: Aug 04 2022
Forest City, IA
--
Ames, IA
Bid Date: Sep 03 2024
Ottumwa, IA
Bid Date: Sep 11 2024
Ottumwa, IA
Bid Date: Sep 06 2024
Dubuque, IA
Bid Date: Sep 05 2024
Dubuque, IA
Bid Date: Sep 06 2024
Dubuque, IA
Bid Date: Aug 15 2024
Dubuque, IA
Bid Date: Aug 21 2024
Dubuque, IA
Bid Date: Aug 23 2024
Dubuque, IA
Bid Date: Sep 06 2024
Dubuque, IA
Bid Date: Sep 22 2024
Winterset, IA
Bid Date: Sep 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.