BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Martinez, California. Completed plans call for site work for a water / sewer project.

In general, the work includes renovations to the existing Martinez Municipal Fishing Pier. The work includes, but is not limited to the following: Demolition and disposal of existing materials to be replaced, pile sleeve, sleeve post, and jack repairs; replacement of timber bracing lumber; replacement of pile caps and steel angles; new decking; new sub caps, piles caps; new guardrails, light standards and electrical fixtures; benches and picnic tables; aluminum gangway bridge; steel sheet pile walls; handrail post repairs; painting; and all appurtenant/hardware/incidental work required to complete the project in accordance with the project's plans and specifications. The Engineer's Estimate is $2,400,000 The Specifications incorporate by reference the Standard Specifications for Public Works Construction, 2021 Edition (Green Book) with applicable supplements as an essential part of the contract documents, and the current State Standard Plans and Specifications (Caltrans). A certified check or bid bond for not less than ten percent (10%) of the proposal shall be submitted with each bid as a guarantee that the bidder, if awarded the Contract, will fulfill the terms of the bid. The City of Martinez reserves the right to refuse any or all proposals or bids or portions thereof. Bids shall be dropped off and timestamped at first floor entrance of City Offices, Engineering Counter, at City Hall. City Hall is open between the hours of 8:00 A.M. to 4:30 P.M., closed 12:00 PM to 1:00 PM, Monday through Friday excluding Holidays. Bidders are hereby notified that provisions of the Labor Code of the State of California, regarding the prevailing wages shall be applicable to the work to be performed under this contract. This contract shall also be subject to a Project Labor Agreement between the City and the Contra Costa County Building Trades Council, a copy of which has been included with the bidding documents. Pursuant to Labor Code Section 1773 the general prevailing wage rates have been determined by the Director of the California Department of Industrial Relations and appear in the California Prevailing Wage Rates, copies of which are on file with the City Clerk of the City of Martinez and are available to interested parties for review on request. Future effective wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but are not printed in such publication. Pursuant to Labor Code Section 1771.4, bidders are hereby notified that the project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. Bidders are advised that if they intend to use a craft or classification not shown on the general wage determination, they may be required to pay the wage rate of that craft or classification most clearly related to it as shown in the general determinations. Contractor shall have the responsibility to comply with applicable provisions of Section 1777.5 of the Labor Code for all apprentice occupations. In the event Contractor willfully fails to comply with the applicable provisions of Section 1777.5, Contractor shall forfeit as a civil penalty the sum of $100.00 for each calendar day of non-compliance, which money may be withheld by City pursuant to the provisions of Labor Code Section 1777.7. Contractor may elect to receive 100 percent of payments due under the contract from time to time, without retention of any portion of the payment by the City of Martinez, by depositing securities of equivalent value to the retention amount in accordance with the provisions of Section 22300 of the Public Contracts Code. Such securities, if deposited by the Contractor, shall be valued by the Director of Community Development of the City of Martinez whose decision of such valuation shall be final. All Bidders shall be licensed under the provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California to do the type of work contemplated in the project and shall be skilled and regularly engaged in the general class or type of work called for under the Contract. The general contractor is required to have a California State Contractor's License Class A. Pursuant to Labor Code Section 1771.1 and subject to exceptions set forth by that section, no contractor or subcontractor may be listed on a bid proposal unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5, and no bid shall be accepted nor contract or subcontract be entered into without proof of the contractor's or subcontractor's current registration to perform public work pursuant to Labor Code Section 1725.5. Any bidder or contractor not properly licensed with the State of California shall be subject to all legal penalties imposed by law, including, but not limited to, any appropriate disciplinary action by the Contractors' State License Board. Failure of the bidder to obtain proper and adequate licensing for an award of the contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. Each shall submit with this bid a statement setting forth his/her/its experience and business standing. Along with the statement, she/he/it shall list three or more projects that he/she/it has constructed, showing their original bid costs and overall costs when constructed, the names, addresses and current telephone number(s) of the owners of the said projects, whether the bidder has been a party to litigation or arbitration involving construction activities, the names and jurisdiction of all such litigation or arbitration and whether the bidder has ever filed for bankruptcy or become insolvent. The City reserves the right to reject any or all bids, or to accept only a portion of certain items of the bid or to waive any informalities in the bid. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment by the parties. Bidder's attention is directed to the insurance requirements. Bidder is required to submit a completed and signed Insurance Acknowledgement with each bid. If a bidder has any problems in understanding or accepting any of the terms and/or conditions specified in the bid documents, said bidder must contact Ali Hatefi by email at ahatefi@cityofmartinez.org at least seven (7) calendar days before the scheduled bid opening. Otherwise, it will be presumed that bidder agrees with, understands and has read all the bid documents above specified.

Award

Water / Sewer

$2,334,230.00

Public - City

Site Work

42

20

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
86
Bidding Soon
1,941
All Active Projects
790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2024

November 4, 2024

img_map_placeholder

To Be Determined, Martinez, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.