Renovation of a detention facility in Beacon, New York. Completed plans call for the renovation of a detention facility.

**As of November 6 , 2024 the project has not been awarded and a timeline for the award is not yet established.** Business Name NYS OGS Design & Construction - Construction Contractors Location(s) Dutchess, New York Number 44701 ELECTRICAL Description Replace Heating System & Windows, Building 21-2 Allows zero unit prices and labor Yes Allows negative unit prices and labor Yes Location/Physical Address Fishkill CF 18 Strack Dr Beacon, NY 12508-0307 County: Dutchess MBE Goal: 5% WBE Goal: 5% SDVOB Goal: 6% Estimated Cost: $500,000 - $1,000,000 Bid Deposit: $22,900.00 Phone the office of George Trashani (845-765-7125) a minimum of 72 hours in advance of the date to provide the names of those who will attend the pre-bid site visit. Only contractors that schedule a visit at least 72 hours in advance will be allowed to participate in the pre-bid site visit. Pursuant to New York State Executive Law Article 15-A and the rules and regulations promulgated thereunder, OGS is required to promote opportunities for the maximum feasible participation of New York State-certified Minority and Women-owned Business Enterprises (MWBEs) and the employment of minority group members and women in the performance of OGS contracts. All bidders are expected to cooperate in implementing this policy. OGS hereby establishes an overall goal of 30% for MWBE participation, 15% for Minority-Owned Business Enterprises (MBE) participation and 15% for Women-Owned Business Enterprises (WBE) participation (based on the current availability of qualified MBEs and WBEs) for Construction Work and an overall goal of 10% for MWBE participation, 5% for Minority-Owned Business Enterprises (MBE) participation and 5% for Women-Owned Business Enterprises ("WBE") participation (based on the current availability of qualified MBEs and WBEs) for Electrical Work and an overall goal of 20% for MWBE participation, 10% for Minority-Owned Business Enterprises ("MBE") participation and 10% for Women-Owned Business Enterprises ("WBE") participation (based on the current availability of qualified MBEs and WBEs) for HVAC Work. The total contract goal can be obtained by utilizing any combination of MBE and /or WBE participation for subcontracting and supplies acquired under this Contract. Trades with 0% goals are encouraged to make good faith efforts to promote and assist in the participation of MWBEs on the Contract for the provision of services and materials. Article 3 of the Veteran's Services Law provides for more meaningful participation in public procurement by certified Service-Disabled Veteran-Owned Businesses (SDVOBs). Bidders are expected to consider SDVOBs in the fulfillment of the requirements of the Contract. Such participation may be as subcontractors or suppliers, as proteges, or in other partnering or supporting roles. OGS hereby establishes overall goals for SDVOBs participation under this contract as follows: 3% for the C trade contractor, 6% for the E trade contractor, and 3% for the H trade contractor, based on the current availability of qualified SDVOBs. Trades with 0% goals are encouraged to make good faith efforts to promote and assist in the participation of SDVOBs on the Contract for the provision of services and materials. The Office of General Services reserves the right to reject any or all bids. For all other questions, please send an email to DCPlans@ogs.ny.gov, or call (518) 474-0203. A. The Project consists of the following separate contracts: Construction Work Project No. 44701-C HVAC Work Project No. 44701-H Electrical Work Project No. 44701-E B. The suffix letter at the end of the project number distinguishes the separate Contracts. The Sections in Division 01 of the Specifications which have more than one suffix letter (such as this Section) are common to each related Contract. 1.04 SUBSTANTIAL AND PHYSICAL COMPLETION DATES A. Substantially complete the Work within 1154 days after the Agreement is approved by the Comptroller. 1. The time allocated for the performance of work under this contract includes 10 days for notification of the Contractor of the Comptrollerís approval of the Agreement. 2. The approval of the Agreement by the Comptroller constitutes the filing of the Contract Documents as a public record and notice to the Contractor that a fully executed contract exists between the Contractor and the State. B. Physically complete the Work within 90 days after the established Substantial Completion date.

Bid Results

Jails / Prisons

$217,687.00

Public - City

Renovation

175

55

21

8

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
423
Active Projects
237
Bidding Soon
4,179
All Active Projects
1,945
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

November 8, 2024

img_map_placeholder

18 Strack Dr, Beacon, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.