BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Beacon, New York. Completed plans call for the renovation of a detention facility.

**As of November 6 , 2024 the project has not been awarded and a timeline for the award is not yet established.** Replace Heating System & Windows, Building 21-2 MBE Goal: 15% WBE Goal: 15% SDVOB Goal: 3% Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $807,500 for C, $201,000 for H, and $22,900 for E). All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $30,000,000 and $40,000,000 for C, between $8,000,000 and $9,000,000 for H, and between $500,000 and $1,000,000 for E. For all other questions, please send an email to DCPlans@ogs.ny.gov, or call (518) 474-0203 The Office of General Services reserves the right to reject any or all bids. DESCRIPTION A. The Contracting Officer shall determine the value of any order on contract or field order by one or more of the following methods: 1. Agreed to Amount: a. By estimating the fair and reasonable cost of: 1) Labor, including all wages, required wage supplements and insurance/taxes required by law (workersí compensation, social security, disability, unemployment, etc.) paid to or on behalf of working foremen, workers and other employees below the rank of the Contractorís designated representative directly employed at the Site of the Project, and, on contracts with an award price less than $500,000, the Contractorís designated representative, regardless of job title or work status. 2) Materials (to be installed or turned over to the State). 3) Consumables are items that are used during the progression of the extra work that do not become a permanent part of the Work and as such are considered overhead. 4) Equipment, excluding hand tools, which, in the judgment of the State, would have been or will be employed exclusively and directly on the omitted work or extra work. 5) Where the omitted or extra work is performed directly by the Contractor; by adding to the total of such estimated costs a sum equal to 15 percent thereof, but, where the omitted or extra work is performed by a subcontractor, by adding a sum equal to 15 percent of said costs for the benefit of such subcontractor, and by adding, for the benefit of the Contractor (no further allowance will be made where extra work is performed by any sub-subcontractor), an additional sum equal to: a) 10 percent of the first $10,000 of the aboveestimated costs, including the subcontractorís percentage override. b) Plus 5 percent of the next $90,000 of the total of said items. c) Plus 3 percent of any sum in excess of $100,000 of the total of said items.

Bid Results

Jails / Prisons

$33,487,011.00

Public - City

Renovation

163

53

21

8

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
423
Active Projects
237
Bidding Soon
4,179
All Active Projects
1,945
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

December 9, 2024

img_map_placeholder

18 Strack Dr, Beacon, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.