BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2024 at 8:00 PM

Updated October 9, 2024

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Scope of work include 10 feet-wide concrete trail, subgrade stabilization, slope paving, pedestrian bridge, retaining walls, culvert crossing, and swale grading. Minority Business Enterprises (MBE), Women Business Enterprises (WBE), Persons with Disabilities Business Enterprises (PDBE) and Small Business Enterprises (SBE) participation goals are as follows: MWSBE Goal: 24% percent, where SBE can make up to 4% of the goal. Estimated Construction Budget: Under $7,500,000

Bid Results

Bridges / Tunnels

$8,070,528.00

Public - City

Paving, Site Work

131

20

151

7

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
4
Bidding Soon
2,106
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2024

October 28, 2024

Project location map

Brays Bayou Greenway Trl, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.