BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2024 at 8:00 PM

Updated July 3, 2025

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Scope of Work is for construction of approximately 5,550 linear feet of 66-inch diameter water lines with all necessary valves and appurtenances, along a Kinder Morgan pipeline corridor from Powderhorn Lane to John Crump Lane. The proposed water line installation will consist of primarily open cut construction; however, trenchless methods are required at crossings of Harris County Roads, private/public utilities, Harris County Flood Control District (HCFCD), and Texas Department of Transportation (TxDOT) facilities. Contract KM-4 is part of the WHCRWA's Surface Water Supply Project (SWSP). Estimate: $17.7M The deadline to ask questions is 9/09/2024 12:00 PM CDT Contractor shall complete all Work as specified or indicated in the Contract Documents for completion of the Project.

Award

Water / Sewer

$14,621,030.00

Public - County

Site Work

66

27

12

8

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
413
Active Projects
242
Bidding Soon
3,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.