BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Salem, Oregon. Working plans call for site work for a water / sewer project.

As of September 4, 2024, project will re-advertise. The purpose of the ITB isto establish a Contract for project: Boiler Plant Domestic Water Re-Pipe at OSP, 2605 State St. Salem, OR 97310 ("Project"), for the benefit of Department of Corrections. The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidentalto, the completion of all construction Work in connection with the project described in the Contract Documents. The following range is a project estimate for bonding purposes: 250,000-400,000 Project Start Date: Ten (10) Calendar Daysfrom Notice to Proceed Substantial Completion: One Hundred Eighty (180) Calendar Days From Notice to Proceed Final Completion: Two Hundred Ten (210) Calendar Days From Notice to Proceed Each Bid shall be accompanied by a certified or cashier's check, irrevocable letter of credit (issued by an insured institution as defined in ORS 706.008, or Original Bid Bond payable to the Department of Corrections("DOC") in an amount equal to ten percent (10%) of the total amount of the Bid. If Bidder wantsto submit a certified or cashier's check, irrevocable letter of credit in lieu of all or a portion of the required bid bond, the Bidder shall contact the Single Point of Contract for instructions. The successful Bidder shall be required to furnish electronic copies of the original Performance Bond and a Payment Bond each in the total amount (100%) of the awarded Contract, executed in favor of the State of Oregon, to ensure faithful performance of the Contract and payment forservices and goods. Liquidated damages of $400.00 will apply to the contract resulting from thisITB. Failure to substantially complete the Project by the, date of Substantial Completion, as specified in the Contract, will result in damage to the State of Oregon. Moreover, failure to fully complete the Project by the date of Final Completion, as specified in the Contract, will also result in damage to the State of Oregon Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $400.00 per calendar day elapsed in excess of the Substantial Completion date stated in Section 4 of the Agreement. Moreover, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $400.00 per calendar day elapsed in excess of the Final Completion date stated in Section 4 of the Agreement. Thisisthe single point of contact for thisITB. Any questions or issues that may arise regarding the Specifications, the bidding process, and/or the award process shall be directed to the Purchaser/Single Point of Contact. Name: Dustin M. Sculatti Phone: (503) 510-5285 E-mail: Dustin.M.Sculatti@doc.oregon.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$400,000.00

Public - State/Provincial

Site Work

12

8

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
63
Bidding Soon
1,077
All Active Projects
401
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

March 5, 2025

img_map_placeholder

2605 State St, Salem, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.