BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Peoria, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Glen Oak Avenue Resurfacing & Ada Improvements The proposed improvement consists of resurfacing approximately 1,445 feet of Glen Oak Avenue, from east of Berkeley Avenue to west of Pennsylvania Avenue. Additional improvements consist of replacing deteriorated sections of curb and gutter, PCC sidewalk, and storm sewer inlets; installation of ADA curb ramps; removal of an existing traffic signal; installation of one light pole and a new solar-powered RRFB system; signage and pavement markings; restoration, and all incidental and collateral work necessary to complete the project as shown on the plans. All provisions regarding EEO, prevailing wage, certified payroll, and DBE and WBE requirements shall be strictly enforced. All work shall be in compliance with specifications and all state and federal laws and regulations. All proposals must be accompanied by cash, certified check, cashier's check, or a bid bond for not less than five percent (5%) of the amount of the bid. The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Engineer. Compliance with the Illinois Prevailing Wage Act is required under this contract . The City of Peoria reserves the right to waive technicalities and to reject any or all proposals CONTRACT TIME The work shall be completed and ready for final payment by December 20, 2024 based on a Notice to Proceed date not later than October 14, 2024. All roadway resurfacing shall be complete and open to traffic by November 22, 2024 as an interim completion date.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

41

7

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
66
Bidding Soon
1,055
All Active Projects
470
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 10, 2024

October 14, 2024

December 20, 2024

img_map_placeholder

NE Glen Oak Ave, Peoria, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.