EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 26, 2024 at 7:00 PM

Updated November 27, 2024

Site work and paving for a road / highway in Marion, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bid Guarantee: Each bid shall be accompanied by a certified check, cashier's check, money order or a satisfactory bid bond executed by the bidder and an acceptable surety, payable to the City of Muncie, in an amount equal to 5% of the maximum bid. The attorney-in-fact who executes the Bond on behalf of the Surety shall affix to the Bond a certified and current copy of his Power-of-Attorney. Bids shall be executed on Indiana State Board of Accounts Form No. 96 (Revised 2013) with Non-Collusion Affidavit, with all sections completely filled in and sworn to as required by the Statutes of Indiana for all bids Contractors receiving awards shall furnish an approved Performance Bond, Labor and Material Payment Bond for 100% of the contract which shall be in full force and effect for 12 months from date of acceptance of the work. Questions concerning the contract documents or bidding procedures shall be directed to the following: Patrick Dierkes Rundell Ernstberger Associates (REA) 618 E. Market St. Indianapolis, IN 46202

Award

Roads / Highways

$1,800,000.00

Public - City

Paving, Site Work

149

16

8

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Plants, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
52
Bidding Soon
877
All Active Projects
298
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

December 2, 2024

img_map_placeholder

Multiple Locations, Marion, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.