BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Eagle, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project includes the following Work: Approximately 1,200 lineal feet of PVC water main varying in size from 6-inch to 8-inch including hydrants, tees, bends, and necessary appurtenances. Water main will be installed along STH 59 from Partridge St to Sherman St and along Wisconsin St from STH 59 to a point approximately 275 lineal feet south of STH 59. The project also includes, but is not limited, to asphalt patching, base aggregate, restoration, traffic control and erosion control. The construction completion dates for STH 59 Water Main Relay will vary depending on which bid alternate is awarded. Bid Alt A: Anticipated substantial completion date of December 20, 2024 and final completion date of May 1, 2025. Bid Alt B: Anticipated substantial completion date of May 9, 2025 and final completion date of May 23, 2025. Instructions to Bidders. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. Owner reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village of Eagle.

Bid Results

Roads / Highways

$623,930.00

Public - City

Paving, Site Work

18

16

31

9

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
74
Bidding Soon
1,766
All Active Projects
782
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 26, 2024

img_map_placeholder

WI-59, Eagle, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.