Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 13, 2024 at 7:00 PM
Updated November 14, 2024
Renovation of a municipal facility in Idaho Falls, Idaho. Completed plans call for the renovation of a municipal facility.
A description of the work of this project can be summarized to include: o RTU-1 - The existing equipment is an indirect gas fired duct furnace with a modulating outside air intake damper and a modulating return air damper. Relief air is accomplished by a nearby roof mounted exhaust fan. The supply airflow rate is 4000 CFM and the natural gas heating capacity is 288 MBH output. This equipment has no cooling capability and no existing electrical infrastructure to support cooling. Replacement equipment will have natural gas fired heating and controls compatible with the existing controls infrastructure in the building. RTU-2 - The existing equipment is an indirect gas fired duct furnace with a modulating outside air intake damper and a modulating return air damper. Relief air is accomplished by a nearby roof mounted exhaust fan. The supply airflow rate is 2200 CFM and the natural gas heating capacity is 162 MBH output. This equipment has cooling DX cooling with a unit mounted coil and a roof mounted 5-ton nominal condensing unit. Replacement equipment will be a similar rooftop unit with DX cooling and an associated air-cooled condenser, natural gas fired heating, and controls compatible with the existing controls infrastructure in the building. RTU-3 - This equipment is almost identical to RTU-1 and the replacement scope is the same. Cooling Tower - The existing equipment is original to the building which was built in 1978. The manufacturer of this equipment is still in business but they no longer make this model so the replacement equipment design will require adaptation to the existing supports. The existing cooling tower provides heat rejection for the building water source heat pump system. The condenser water system has a plate and frame heat exchanger in the basement to hydraulically isolate the condenser water streams. The heat exchanger was replaced recently as the original system would have had a shell and tube exchanger. The plate and frame exchanger is in excellent condition. The condenser water system is designed with a remote sump which is located in the basement. This means the cooling tower basin currently never holds water. The design of the replacement will use the same configuration to avoid adding operating weight to the new tower thus increasing structural loads. The new cooling tower has been specified as fiberglass due to weight and existing structure constraints Plans, specifications, proposal forms and other information are on file for examination at the following locations: State of Idaho Division of Public Works, 502 N. 4th St., Boise, ID 83702 (208) 332-1900 , Blueprint Specialties, 6205 W. Overland Rd., Boise, ID 83709 (208) 377-0294 , SEEDIdaho P.C., 913 S. Latah St., Suite H, Boise, ID 83705 (208) 807-9750 A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractor's License for the State of Idaho is required to bid on this work. Estimated Cost: $400,000
Award
Municipal
$322,169.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2024
November 18, 2024
150 Shoup Ave, Idaho Falls, ID
Related To This Project
Idaho Falls, ID
Bid Date: Oct 15 2024
Idaho Falls, ID
Bid Date: Sep 30 2024
Idaho Falls, ID
Bid Date: Sep 26 2024
Idaho Falls, ID
Bid Date: Oct 01 2024
Idaho Falls, ID
Bid Date: Oct 30 2024
Idaho Falls, ID
Bid Date: Oct 30 2024
Idaho Falls, ID
Bid Date: Jan 24 2019
Idaho Falls, ID
Bid Date: Oct 25 2024
Idaho Falls, ID
Bid Date: Aug 28 2024
Idaho Falls, ID
Bid Date: Sep 10 2024
Idaho Falls, ID
Bid Date: Aug 29 2024
Idaho Falls, ID
Bid Date: Aug 06 2024
Idaho Falls, ID
Bid Date: Jul 25 2024
Idaho Falls, ID
Bid Date: Jul 25 2024
Idaho Falls, ID
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
