BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Idaho Falls, Idaho. Completed plans call for the renovation of a municipal facility.

A description of the work of this project can be summarized to include: o RTU-1 - The existing equipment is an indirect gas fired duct furnace with a modulating outside air intake damper and a modulating return air damper. Relief air is accomplished by a nearby roof mounted exhaust fan. The supply airflow rate is 4000 CFM and the natural gas heating capacity is 288 MBH output. This equipment has no cooling capability and no existing electrical infrastructure to support cooling. Replacement equipment will have natural gas fired heating and controls compatible with the existing controls infrastructure in the building. RTU-2 - The existing equipment is an indirect gas fired duct furnace with a modulating outside air intake damper and a modulating return air damper. Relief air is accomplished by a nearby roof mounted exhaust fan. The supply airflow rate is 2200 CFM and the natural gas heating capacity is 162 MBH output. This equipment has cooling DX cooling with a unit mounted coil and a roof mounted 5-ton nominal condensing unit. Replacement equipment will be a similar rooftop unit with DX cooling and an associated air-cooled condenser, natural gas fired heating, and controls compatible with the existing controls infrastructure in the building. RTU-3 - This equipment is almost identical to RTU-1 and the replacement scope is the same. Cooling Tower - The existing equipment is original to the building which was built in 1978. The manufacturer of this equipment is still in business but they no longer make this model so the replacement equipment design will require adaptation to the existing supports. The existing cooling tower provides heat rejection for the building water source heat pump system. The condenser water system has a plate and frame heat exchanger in the basement to hydraulically isolate the condenser water streams. The heat exchanger was replaced recently as the original system would have had a shell and tube exchanger. The plate and frame exchanger is in excellent condition. The condenser water system is designed with a remote sump which is located in the basement. This means the cooling tower basin currently never holds water. The design of the replacement will use the same configuration to avoid adding operating weight to the new tower thus increasing structural loads. The new cooling tower has been specified as fiberglass due to weight and existing structure constraints Plans, specifications, proposal forms and other information are on file for examination at the following locations: State of Idaho Division of Public Works, 502 N. 4th St., Boise, ID 83702 (208) 332-1900 , Blueprint Specialties, 6205 W. Overland Rd., Boise, ID 83709 (208) 377-0294 , SEEDIdaho P.C., 913 S. Latah St., Suite H, Boise, ID 83705 (208) 807-9750 A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractor's License for the State of Idaho is required to bid on this work. Estimated Cost: $400,000

Sub-Bidding

Municipal

$400,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
13
Bidding Soon
177
All Active Projects
66
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 1, 2024

October 31, 2024

img_map_placeholder

150 Shoup Ave, Idaho Falls, ID

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.