BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in San Miguel, California. Contact the soliciting agency for additional information.

The San Miguel Community Services District (District) has prepared this Request for Qualifications/Proposals (RFQ/P) for engineering services for an alternatives analysis, design, and CEQA support for the floodproofing of the District's sanitary sewer lift station, in the community of San Miguel, San Luis Obispo County, California. San Miguel is an unincorporated community in San Luis Obispo County, with approximately 2,820 residents. San Miguel is located approximately 7 miles north of the City of Paso Robles. The San Miguel Community Services District was formed in 2000 combining the San Miguel Fire District, County Service Area 1, San Miguel Sanitary District, and San Miguel Lighting Districts. The District currently provides fire services, street lighting and landscaping, wastewater collection and treatment, potable water production and distribution, and solid waste services. The District is Governed by a Board of five Directors and has a General Manager, Director of Utilities, six admin and Utilities Personnel, a Fire Chief, Assistant Fire Chief and up to 20 paid on-call firefighters. The majority of operating funds for the District come from user fees and property tax. The District operates one sanitary sewer lift station, which is along the eastern side of Soka Way between Chick Lane and Wimer Way, in San Miguel, CA. The location of the lift station is shown in Attachment A. Heavy storms in January 2023 flooded this location, which is adjacent to the Salinas River, damaging the lift station. The lift station has been repaired but has not been floodproofed to prevent damage from future flood events. The District requests that different floodproofing alternatives be analyzed for the lift station. As part of this effort, it is expected that the selected firm perform hydraulic modeling of the Salinas River and environs to estimate key flood parameters, such as scour velocity and depth. The alternatives analysis may include, but is not limited to, relocating the lift station to a higher elevation or construction of flood walls around the site permitter. The selected firm will then prepare design documents and provide CEQA documentation for the recommended floodproofing alternative. It is anticipated that a Mitigated Negative Declaration will be required, following the Initial Study. The goal of the project is to have bid-ready construction documents and permitting complete to continue with construction of the recommended alternative. Question Deadline 09/16/2024 Responses to Questions Posted By 9/20/2024, 5pm local time Consultants must direct all inquiries to the District in writing, via email to the General Manager, Kelly Dodds kelly.dodds@sanmiguelcsd.org. All inquiries will be responded to in writing, and questions and responses will be disseminated to all consultant teams for their consideration. Inquiries received after this deadline may not be responded to. Late proposals (submitted after the specified due date/time) shall be rejected by the District and returned un-opened to the Proposer. The District reserves the right to accept or reject any or all proposals. Proposals may be withdrawn by a signed written request submitted to the District at any time prior to 5 p.m. of the due date of the proposal. The District reserves the right to issue a written notice to all participating firms of any change in the proposal requirements or submission schedule should the District determine, in its sole discretion, that such changes are necessary. Consultant Notice of Contract Award/Begin Contract Negotiations 10/25/2024 The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
18
Bidding Soon
337
All Active Projects
148
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2024

img_map_placeholder

942 Soka Wy, San Miguel, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.