BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2024 at 8:00 PM

Updated October 22, 2024

Site work and paving for a road / highway in Avon, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Contract No. 04924 Installation of a High Friction Surfacing Treatment (HFST) on curves on US-12 (N-8) near Avon from RP 8.34 to RP 9.20, on I-15 near Jefferson City from RP 175.60 to RP 176.01, and on I-15 Southbound near Clancy from RP 184.64 to RP 184.80 and a High Friction Chip Seal (HFCS) on I-15 Northbound near Clancy from RP 184.64 to RP 184.80 for all travel lanes (excluding shoulders and ramp lanes) to address road departure crashes. Guardrail will be upgraded at the Avon location. Contract to be completed as outlined in the Contract Time special provision found in the proposal. The Disadvantaged Business Enterprises contract goals are 0.00%. This project is under the jurisdiction of the Billings District Administrator. Uniform No. 10297000 MT DOT - Call Order 103 - SF 199 Butte District Hfst The Question-and-Answer Forum opens at 5:00 p.m. on the bid letting advertisement date and closes at 10:00 a.m. on the Monday before the bid letting. If Monday is a state holiday, the forum will close on Friday before the bid letting at 3:00 p.m. Answers provided by the Department to the questions, clarifications, and notifications can be posted up to 5:00 p.m. on the day before the letting.

Award

Roads / Highways

$985,659.00

Public - State/Provincial

Paving, Site Work

10

7

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
22
Bidding Soon
142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

November 18, 2024

Project location map

US-12, Avon, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.