BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

This is a service / maintenance or supply contract in Orlando, Florida. Contact the soliciting agency for additional information.

The Contractor shall provide all labor, supervision, management, administrative oversight, general supplies for the performance of duties and cleaning of work area, and all other items necessary for, or incidental to, providing goods/services at the Orlando International Airport in accordance with this Specification. The AAR will provide direction on what general supplies are the responsibility of the Contractor and what type of cleaning products are approved. The runways consist of centerline, edge, touchdown zone lighting fixtures. Refer to Attachment "A" for a tabulation of light fixture counts. The lighting circuits are connected in series and are powered by multiple step Constant Current Regulators ("CCR") located in four (4) electrical vaults on the airfield. Contractor shall provide the testing services on an annual basis or as otherwise requested. All work performed will be on the Air Operations Area ("AOA") and therefore, all AOA procedural requirements shall be strictly adhered to by the Contractor. Photometric and CCR testing of airfield lighting systems shall be performed by a firm with demonstrated capability for measurement of electrical characteristics of airfield lighting circuits and regulators and photometric performance of airfield fixtures. Because of the correlation between the electrical performance of airfield lighting circuits and the photometric performance of the airfield lighting fixtures, all work shall be done by a single firm. The firm shall have experience in evaluating the test results against FAA standards and manufacturers' performance criteria. See Attachment "A". Tentative Committee Date:November 12, 2024 Tentative Aviation Authority Board Date:December 11, 2024

Award

Transportation Terminals

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
80
Bidding Soon
2,463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

November 21, 2024

Project location map

1 Jeff Fuqua Blvd, Orlando, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.