Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 6, 2024 at 8:00 PM
Updated September 7, 2024
Site work and paving for a civil project in Salmon, Idaho. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
A description of the work of this project can be summarized to include extension of a city municipal eight-inch water line approximately 950 feet along state highway 93 north through the city of Salmon, Idaho. The water line extension is within the state highway right of way requiring the contractor to provide a traffic plan. The work includes new fire hydrants, connections, extension of the 8" fire line onto the ITD Maintenance Yard for future fire line connection along with a 3" water line extension for domestic water services. The contractor is responsible for all asphalt patch back, backfilling, landscaping repair, and shoulder repair created during excavation for the water line. Work will not start earlier than October 1, 2024, or later than December 3, 2024, and must be completed by February 1, 2025. Deadline To Receive Questions: 12:00 p.m. (MT) on August 29, 2024 A bid bond or a certified or cashier's check in the amount of 5% of the total bid, including add alternates, is required. Idaho Public Works license is required at the time of bid opening for all work on this project. IDOT: ITD D6 Salmon Water Line Extension
Bid Results
Water / Sewer
$513,950.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2024
October 1, 2024
US-93, Salmon, ID
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
