Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, asbestos abatement and renovation of a residential development in Binghamton, New York. Completed plans call for the renovation of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.
DASNY is soliciting bids from Multiple Prime HVAC and Electrical Contractors for the following Scope of Work to be performed at the Broome Developmental Center. The project consists phased replacement of the existing Chiller equipment over the course of two winters. Phase 1 to be completed by April 30, 2025, and Phase 2 to be completed by April 30, 2026. HVAC CONTRACT Work in the HVAC Contract includes but is not limited to, the following: Phase 1: Asbestos Abatement & Hazardous Materials Abatement Perform hazardous materials abatement for the material types listed below, as detailed in the hazardous materials drawings. Environmental work shall be performed in conjunction with mechanical work for Phase. 1Ensure the environmental removals are coordinated prior to commencement of work. Surfaces determined to be coated with lead-based paint (LBP) or a lead coating (greater than 1.0 mg/cm2) in the first floor and basement to the phase delineation line on M-105. Materials identified to be coated with lead-containing paint (less than 1.0 mg/cm2). Materials identified to be asbestos-containing materials (ACM) on the first floor. Phase 2: Demolish and replace condenser water piping with CPVC schedule 80 piping (from the phase delineation in the basement refrigeration room to the cooling tower connections). Apply firestopping at interior piping penetrations as indicated in the mechanical drawings and per specification 078400 in addition to locations where asbestos abatement and/or hazardous materials abatement was per- formed and fireproofing was damaged or abated. Perform a rebuild to the two (2) cooling towers followed by an inspection as outlined by the original equipment manufacturer. Coordinate the storage of the new chillers during Phase 1. Provide proof of purchase of the two (2) new chillers prior to September 1, 2025. Assist commissioning agent as required. Hazardous Materials Abatement Perform hazardous materials abatement for the material types listed be- low, as detailed in the hazardous materials drawings within this drawing package. Environmental work shall be performed in conjunction with mechanical work for Phase 2. Ensure the environmental removals are co- ordinated prior to commencement of work. Surfaces determined to be coated with lead-based paint (LBP) or a lead coating (greater than 1.0 mg/cm2) in the basement to the phase delineation line on M-105. Materials identified to be coated with lead-containing paint (less than 1.0 mg/cm2). HVAC Demolish and replace six (6) pumps, two (2) chillers and associated refrigerant relief piping, and one (1) exhaust fan. All this equipment will be replaced per construction documents with new equipment, any changes required by code will be included in the updated equipment selections. Install new refrigerant relief piping and an extension to the existing exhaust air ductwork to provide a termination point at least 20 feet from any intake or window; remove and replace exhaust fan. Piping system accessories, such as chilled water air separator, expansion tank, side stream filter, and chemical feeder will be demolished and re- placed per construction documents. The chemical treatment system for the condenser water is existing to remain. A portion of the associated chilled water piping will be replaced, the piping will be re-applied with insulation as required per the insulation specification. All condenser water piping will be demolished and replaced with CPVC schedule 80 piping (from the phase delineation in the basement refrigeration room to the chiller connections). Apply fireproofing to locations where lead abatement was performed and fireproofing was damaged. Minority Owned Sub-Contracting Goal: 3% Women Owned Sub-Contracting Goal: 3% Service-Disabled Veteran-Owned Business Contracting Goal: 1%. Contract term: April 30, 2026. Location: Broome DDSO, 249 Glenwood Road, Binghamton, New York 13905. The scope of services of the HVAC contract includes but is not limited to installation of Building automation system, HVAC systems, equipment, instrumentation, and controls. The estimated construction cost for the HVAC Base Bid is between $3,600,000 - 3,900,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. If you have any questions concerning the Fair Play Act, please call the State Labor Department toll-free at 1-866-435-1499 or email us at: dol.misclassified@labor.ny.gov .
Bid Results
Residential Subdivision
$122,949.00
Public - State/Provincial
Asbestos Abatement, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2024
November 18, 2024
249 Glenwood Rd, Binghamton, NY
Related To This Project
Binghamton, NY
Bid Date: Sep 25 2024
Binghamton, NY
Bid Date: Sep 24 2024
Binghamton, NY
Bid Date: Sep 11 2024
Binghamton, NY
Bid Date: Sep 11 2024
Binghamton, NY
Bid Date: Sep 23 2024
Binghamton, NY
Bid Date: Oct 02 2024
Binghamton, NY
Bid Date: Oct 01 2024
Binghamton, NY
Bid Date: Oct 08 2024
Binghamton, NY
Bid Date: Sep 19 2024
Binghamton, NY
Bid Date: Sep 11 2024
Binghamton, NY
Bid Date: Sep 04 2024
Binghamton, NY
Bid Date: Aug 23 2024
Binghamton, NY
Bid Date: Aug 22 2024
Binghamton, NY
Bid Date: Sep 11 2024
Binghamton, NY
Bid Date: Sep 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.