BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2024 at 7:00 PM

Updated November 22, 2024

Site work and paving for a civil project in Frisco, Texas. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and bridge / tunnel.

The project, Independence Hike and Bike Trail, includes but is not limited to, demolition of existing facilities, grading, paving, pedestrian bridges, retaining wall construction, erosion control, signage, temporary irrigation, and landscaping for the 0.50 miles of 12' concrete trail from the alley of Pond Cypress Ln. to the existing bridge located at the Frisco Independence Soccer Fields. Question Deadline 09/11/2024 at 5:00 PM CT Questions are to be sent through electronically. Proposals must be accompanied by a cashier's check or certified check upon a national bank, or a bid bond from a reliable surety company in an amount not less than five percent (5%) of the total maximum proposal price, as a guarantee that the Proposer will enter into a contract and execute a performance bond and a payment bond within (10) days after notice of award of contract to him. A performance bond will be required for all contracts over $100,000.00 and a payment bond will be required for all contracts over $50,000.00 (both payment and performance bonds are to be in the full contract amount). The City reserves the right to reject any or all proposals, to waive formalities, or to proceed otherwise when in the best interest of the City. Bid open description; Proposals will be publicly opened and read aloud at the Frisco City Hall located at 6101 Frisco Square Blvd., Frisco, Texas 75034. Join on your computer, mobile app or room device. Join the meeting now Meeting ID: 277 374 376 367 Passcode: 7q6rcW Or call in (audio only) +1 469-445-0737,,37154401# United States, Dallas Phone Conference ID: 371 544 01# Estimate of Probable Cost Range: $1,800,000.00 - $2,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$1,500,829.00

Public - City

Paving, Site Work

31

32

13

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
398
Active Projects
206
Bidding Soon
3,787
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

November 18, 2024

Project location map

Pond Cypress Ln, Frisco, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.