Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 20, 2025 at 7:00 PM
Updated February 21, 2025
Site work and new construction of a medical facility in Oklahoma City, Oklahoma. Completed plans call for the construction of a medical facility; and for site work for a medical facility.
BID PACKAGE 47: Perforated Metal Wall Panels 1. Contractor responsible for all perforated metal wall panel complete. Including material and installation. 2. Perforated Metal Wall Panels are located at all locations identified as MF-1. 3. MF-2 and MF-3 are NOT provided by this contractor. 4. Provide any and all welding of material provided by others to steel accessories or embeds, i.e., door/window frames to embeds. 5. Embeds are already placed in structural concrete. Contractor is responsible for using current embed layout for installation of perforated metal wall panels. 6. Provide all required fasteners. 7. Contractor responsible for the laser etched graphics as indicated on North Elevation. 8. Contractor responsible to field measure all aspects of their scope required to complete scope of work. 9. Provide all field touch-up painting and cleaning upon completion of installation. 10. Contractor responsible for fall protection as related to this scope of work. 11. Contractor responsible for all scope items listed in the “General Scope attached.” 12. Contractor responsible for non-marking tires for any forklifts or machinery in parking garage. 13. Provide all layouts, staking & surveying as pertains to this scope of work from a control point provided by the construction manager. 14. Contractor shall furnish manpower, materials, and equipment necessary as required by the project schedule including interim milestone dates, and furnish additional crews, equipment, etc. and/or overtime to maintain the schedule if Contractor falls behind due to their own fault or due to inclement weather. No substitution will be considered prior to receipt of Bids unless written request for approval has been received by the Architect (through the Construction Managers office) at least ten (10) days prior to the date for receipt of Bids. All substitution requests must be submitted to the Construction Manager for processing.
Post-Bid
Medical
$90,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
April 21, 2025
960 NE 13th St, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
Bid Date: Sep 10 2024
Oklahoma City, OK
Bid Date: Oct 23 2024
Oklahoma City, OK
Bid Date: Sep 10 2024
Oklahoma City, OK
Bid Date: Sep 03 2024
Oklahoma City, OK
Bid Date: Sep 19 2024
Oklahoma City, OK
Bid Date: Jun 24 2025
Oklahoma City, OK
Bid Date: Sep 17 2024
Oklahoma City, OK
Bid Date: Nov 21 2024
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Sep 12 2024
Oklahoma City, OK
Bid Date: Sep 26 2024
Oklahoma City, OK
Bid Date: Mar 24 2021
Oklahoma City, OK
Bid Date: Sep 12 2019
Oklahoma City, OK
Bid Date: Oct 28 2020
Oklahoma City, OK
Bid Date: May 05 2021
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
