BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a civil project in San Marcos, Texas. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

The Scope of work generally includes the supply, delivery, installation assistance, startup, operational assistance, decommissioning and removal of a MF/UF membrane pilot treatment system to treat clarified water at HC WTP. The following services are anticipated to be required for the pilot study. o Direct and assist with the offloading and installation of the pilot unit. o Assist the development of the piloting program by supplying pilot procedures for operation of the pilot unit. o Conduct pilot plant start-up. o Provide training on the operation of the membrane pilot system to the Engineer and the CRWA's operational staff. o Assist with remote data collection and analysis. Membrane pilot equipment supplier will provide the ability to download the data from the pilot. Should the MFSS desire remote access, the MFSS will supply a cellular connection and cover fees associated with receiving data via cellular connection. Provide Engineer and CRWA real-time access to pilot data for monitoring purposes. CRWA will retain control of the data collected. o Be available as needed for technical support with remote troubleshooting of the pilot plant operation as required during the pilot testing program. There shall be three trips for a total of 9 days on site (not including travel days) for troubleshooting after start-up and commissioning. o Collect data required to validate membrane design criteria, backwashing and chemical cleaning protocols, and process guarantees. o Prepare a written report at the end of the pilot, summarizing the results of the pilot data collection. o The Engineer will prepare and submit a pilot test report that meets the TCEQ's requirements for innovative technologies. The pilot test report will meet the requirements outlined by the TCEQ's Public Drinking Water Program Staff Guidance in the Review of Pilot Study Reports for Membrane Filtration (30 TAC 290.30 and 30 TAC 290.42(g)). The MFSS shall provide all data necessary to meet these requirements, including all process flows, feed filtrate and transmembrane pressure, temperatures during filtration and cleaning, details of the pilot scale and proposed full scale direct integrity test necessary to calculate log removal values and all backwash and chemical cleaning cycle sequences and setpoints. At complete list of data required will be provided to the selected qualified manufacturers. o MFSS will be responsible for supply of the transfer pump, pump controls tied to the pilot skid HMI, and necessary connections to transport water from the settled water storage tank to the MF/UF membrane pilot units. Question Deadline 09/06/2024 at 12:00 PM CT Questions should be submitted to: Hanna Diaz at hdiaz@crwa.com. Responses to questions posed may be posted on CRWA's website.

Post-Bid

Water / Sewer

$2,165,000.00

Public - State/Provincial

Renovation, Site Work

5

5

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
28
Bidding Soon
2,326
All Active Projects
905
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.