Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a municipal facility in Park City, Utah. Conceptual plans call for site work for a municipal facility.
Structural Engineering Design Services for Retaining Wall Replacement Kimley-Horn will provide the services specifically set forth below. Task 1: 30% Wall Structural Plans and Geotechnical Recommendations Wall Structural Plans Prepare site-specific design criteria for the retaining wall based upon the local authority having jurisdiction. Coordinate with geotechnical engineer to obtain design recommendations for the retaining wall. Coordinate with the design team to determine final facing of wall, location of pedestrian barriers, property lines and limits of excavation, as required. Develop preliminary structural calculations for the retaining wall. Submit 30% construction documents in electronic PDF format for the retaining wall. Plans will indicate location of the new wall, approximate pile spacing and lagging information and approximate location of proposed guardrail behind the new wall. A sheet set is noted below: Cover Sheet General Note Sheet Plan and Elevation Sheet Typical Detail Sheet The deliverable for this task, is a set of 30% drawings, in 11x17 format, delivered electronically. Geotechnical Recommendations Kimley-Horn will retain a qualified and licensed geotechnical engineer subconsultant that provide the following scope: Geotechnical recommendations for a new soldier pile concrete lagging wall built in front of the existing retaining wall. Recommendations for excavation behind the existing concrete wall while protecting the existing soil nail anchors from the soldier pile wall. Geotechnical backfill recommendations. The deliverable for this task is a geotechnical report with recommendations. Task 2: 100% Wall Structural Plans Develop final structural calculations for the retaining wall. Coordinate with the Contractor on any field conditions that may impact the new wall layout and design. Attend one site visit to coordinate with the Client and Contractor in the development of the construction documents. Submit 100% construction documents in electronic PDF format for the retaining wall. Plans will indicate location of the new wall, final pile spacing and lagging information and location of proposed handrail behind the new wall. The following additional coordination items will be included in the deliverable: Relocation of electrical boxes, roadway signs and electrical conduits to be noted on the plans as items to be coordinated by the Contractor. Removal of an abandoned drilled shaft foundation at the start of the wall (south side). Removal and replacement of concrete slab sections that are damaged or that will be impacted within the scope of work. A sheet set is noted below: Cover Sheet Survey Control Sheet General Note and Quantity Sheet Demolition Plan Plan and Elevation Sheet Structural Details 1 of 3 Structural Details 2 of 3 Structural Details 3 of 3 Soldier Pile Wall Data Table This task includes up to 20 hours of coordination calls or meetings with the Client and Contractor. It is assumed that the comments from the Contractor will not change the design intent or concept of the proposed wall. The deliverable for this task is a set of plans, in 11x17, signed and sealed, delivered electronically.
Conceptual
Municipal
$89,700.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2025
To Be Determined, Park City, UT
Related To This Project
Park City, UT
Bid Date: Sep 06 2024
Park City, UT
Bid Date: Sep 04 2024
Park City, UT
--
Park City, UT
Bid Date: Oct 18 2024
Park City, UT
Bid Date: Oct 30 2024
Park City, UT
Bid Date: Dec 20 2024
Park City, UT
Bid Date: Dec 12 2024
Park City, UT
Bid Date: Jan 15 2025
Park City, UT
Bid Date: Nov 05 2024
Park City, UT
Bid Date: Aug 30 2024
Park City, UT
Bid Date: Aug 16 2024
Park City, UT
Bid Date: Nov 14 2024
Park City, UT
--
Park City, UT
--
Park City, UT
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.