Renovation of a municipal facility in Newport, Washington. Completed plans call for the renovation of a municipal facility.
The purpose of the bid is to obtain a contractor to perform meter exchanges/replacements as the District is upgrading all of its electric meters to an Advanced Metering Infrastructure (AMI) system. The project consists of replacing approximately 8,000 single-phase 2S electric meters throughout the District's service territory in Pend Oreille County. Pend Oreille County is in northeast corner of Washington State, an area of approximately 1,400 square miles and a 2022 population of 13,401. The District serves approximately 9,000 residential customers and has approximately 9 customers per mile of line. The work will be performed under the direction of the District's Director of Customer Services or other designated District personnel. The work will be done under a written contract in a form acceptable to District. The District shall be the exclusive judge of all bids and reserves the right to accept or reject any bid proposal based upon its own criteria and sole judgment. The selected contractor will be responsible for the removal and installation of single-phase 2S electric meters per District standards. The contractor is to provide an experienced management team and skilled labor force to facilitate the installation of approximately 8,000 single-phase 2S electric meters and perform the project safely, accurately, on time, within promised budget and with customer satisfaction. The selected contractor shall provide all labor, supervision, equipment, tools, and materials (vehicles, fuel, PPE, iPad, and meter exchange tools to include voltmeters, socket tension tools, meter pullers, etc.) to perform the meter exchanges and documentation. The District will supply the meters, rings, and seals. On a recurring basis, the District will supply a list of meters needing exchanged to include the meter number, location, etc., to be grouped by area to maximize drive-time efficiencies. Contractor will be responsible for following the below outlined Meter Exchange Procedure and for scheduling work to be performed after receipt of the list of meters. The proposed work hours are four (4) ten-hour days from Monday to Thursday 6:00am - 4:30pm for field installers. The District will provide specific blackout dates if applicable. Meter Exchange Procedure 1. After crews are dispatched with service orders they are to contact the resident by knocking on the door. If the resident is present, contractor is to inform them of the meter replacement project and complete the meter replacement. If the resident is not present, contractor shall complete the meter replacement and leave a door hanger. If the meter replacement cannot be completed due to customer inconvenience or accessibility issues, the contractor shall provide the customer with information to call to schedule an appointment. Appointments are to be handled by contractor personnel. 2. Crews are to verify information obtained from the District and what is found in the field. Any differences in information shall be given to the District to be addressed. Any unsafe issues needing immediate attention shall be reported to the District immediately. 3. Before and after pictures of meter and meter socket and surrounding area, meter reads and GPS locations are to be collected at the time of the meter exchange. 4. During the meter exchange a report of visual inspections of any safety hazards or wiring concerns shall be noted by crews. These inspections include the meter, meter socket and surrounding area to include socket condition, current diversion detection, grounding issues, or other notable concerns. Line and load voltages on all meter base lugs are to be taken at that time. Hot socket tension tools are used on suspected damaged meter bases. 5.Captured data from installers is QA'd by contractor personnel prior to transmission to the District. After verified, data shall be sent to the District in agreed upon format. 6. Weekly status reports are to be provided to the District and should include the number of meters installed, inventory, observations, etc. It is desired by the District to have this project start on or around October 1, 2024 and be completed by September 30, 2025. Each bid must be accompanied by the following: The completed bid proposal form. Bidders also to furnish a project schedule. A bid guarantee in an amount not less than five percent (5%) of the bid amount, made payable to PUD No. 1 of Pend Oreille County. Performance and payment bonds will be required with the contract. The State of Washington prevailing wage rates are applicable for this contract located in Pend Oreille County. Bidders are responsible to verify and use the most recent prevailing wage rates. The applicable prevailing wage rates may be found on the Department of Labor and Industries website. The District reserves the right to cancel this bid at any time, or issue amendments or corrections. The District reserves the right to award this contract, or to not award this contract. Women's, minority, and small business enterprises are encouraged to apply. The District is an equal opportunity employer. uestion Deadline 09/04/2024 at 2:00 PM PT Questions related to this submittal must be submitted by online. Responses to these questions will be made available to all bidders via online
Award
Municipal
$484,219.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2024
October 1, 2024
To Be Determined, Newport, WA
Related To This Project
Newport, WA
--
Newport, WA
Bid Date: Nov 05 2024
Newport, WA
Bid Date: Sep 03 2024
Newport, WA
Bid Date: Jul 16 2024
Newport, WA
Bid Date: Jul 29 2024
Newport, WA
Bid Date: Apr 13 2021
Newport, WA
Bid Date: Jun 04 2024
Newport, WA
Bid Date: Apr 23 2024
Newport, WA
--
Newport, WA
Bid Date: Mar 26 2024
Newport, WA
--
Newport, WA
Bid Date: Mar 01 2024
Newport, WA
Bid Date: Nov 30 2023
Newport, WA
Bid Date: Mar 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.