Site work and paving for a bridge / tunnel in Cotopaxi, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Colorado Division of Parks and Wildlife is accepting bids for the removal & replacement of concrete flatwork, changing rooms and restroom fixtures. Contractor Questions: All questions related to the project shall be submitted via e-mail to the Project Manager, Chase Keltgen, PE at chase.keltgen@state.co.us. The deadline for questions is August 22, 2024 at 5:00 PM. NOTICE TO PROCEED September 30, 2024 (Tentative) SUBSTANTIAL COMPLETION November 14, 2024 (Tentative) PERFORMANCE BOND, LABOR AND MATERIAL BOND: The successful bidder shall furnish a bond in the amount of 100% of the contract price for performance and for material and labor payment when bid is equal to or exceeds $150,000. The bond shall be executed on the standard State of Colorado form. The State requests that the Surety and Contractor leave the date of the Contract found on the first page of each bond form, blank and we will 'pen' in the date after the Controller executes the Contract. These bonds will be submitted along with the standard State Agreement form within 10 days of the "Notice of Award." The liquidated damages set forth is an amount, agreed to by the Contractor and the Division, as reasonably representing additional project construction administration costs incurred by the Division and projected loss of revenue to the Park if the Contractor fails to complete performance within the contract time. For this project the Liquidated Damages will be $150.00 per day. If all bids exceed such amount, the right is reserved to reject all bids. The Division of Parks and Wildlife reserves the right to reject any or all proposals, to waive informalities, and to accept any proposal deemed desirable. Question Deadline - 5:00 PM on Thursday, August 22, 2024. Send all questions via email to chase.keltgen@state.co.us. Questions sent after the deadline will not be addressed. A Q&A document will be posted to the State VSS website with answers to submitted questions.

Award

Bridges / Tunnels

$133,660.00

Public - State/Provincial

Paving, Site Work

12

19

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
22
Bidding Soon
382
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

September 30, 2024

Project location map

10375 Co Rd 45, Cotopaxi, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.