BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2024 at 7:00 PM

Updated November 23, 2024

Site work and new construction of a water / sewer project in Garden Grove, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of a wellhead treatment facility for the City of Garden Grove to remove the Per- and Polyfluoroalkyl substances (PFAS) contaminants at Well 19 before furnishing the water to their customers. The Water Treatment Plant include the work shown on drawings and technical specifications and summarized as follows: 1. Selective demolition 2. Site development 3. Masonry Construction 4. Fence removal and reconstruction 5. Foundations 6. Cartridge Filters 7. I/X Vessels installation (Furnished by OCWD) 8. Electrical and I&C conduits, wiring, gear and ancillaries 9. Piping and appurtenances 10. Well rehabilitation 11. Well pedestal reconstruction 12. Well pump replacement Each Bid shall be accompanied by one of the following: a certified or cashier's check, or bid bond in an amount not less than ten percent (10%) of the total bid price, payable to the Orange County Water District, as a guarantee that the Bidder, if its Bid is accepted, shall promptly execute the Agreement, furnish a satisfactory Faithful Performance Bond in an amount not less than one hundred percent (100%) of the total bid price, furnish a Labor and Material Bond in an amount not less than one hundred percent (100%) of the total bid price, and furnish certificates evidencing that the required insurance is in effect in the amounts set forth in the Insurance Conditions. The Faithful Performance Bond shall remain in full force and effect through the guarantee period as specified in the General Provisions Question Deadline 09/16/2024 at 2:00 PM PT All questions regarding the Bid must be submitted in writing before the deadline due date Questions received after the questions due date may not be considered. Attention: Ryan Bouley, Project Manager Email: rbouley@ocwd.com Completion of work must be substantially completed within three-hundred sixty (360) consecutive calendar days from the date of the Notice to Proceed issued by the District. Failure to complete the Work within the time set forth herein will result in the imposition of liquidated damages for each day of delay, in the amount set forth in the Information for Bidders The Orange County Water District reserves the right to reject any or all bids, and to waive any informality in any bid.

Award

Water / Sewer

$4,553,400.00

Public - County

New Construction, Site Work

71

32

19

8

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
608
Active Projects
214
Bidding Soon
3,979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

November 25, 2024

Project location map

11502 Dolan St, Garden Grove, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.