EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2024 at 8:00 PM

Updated October 6, 2024

Renovation of a water / sewer project in Carneys Point, New Jersey. Completed plans call for the renovation of a water / sewer project.

Gateway Pumping Station Standby Power System Improvements The time for preparing bids shall be a minimum of 10 days from Notice to Bidders to receipt of Bids. The project includes the removal of an existing outdoor standby power generator and complete installation of a new, fully operational outdoor sound attenuated generator, to replace the existing equipment, located at the Gateway Pumping Station. Major items of work include but are not limited to the complete removal of the existing diesel generator and concrete pad and installation of a new generator and concrete foundation including but not limited to installing all electrical components required to reconfigure the existing system, diesel generator, fuel system, support structure for electrical equipment, TVSS / SPD, circuit breakers, and required conduit and wiring to supply necessary loads in accordance with applicable codes, in addition to all startup and load testing of the equipment. The Issuing Office for the Bidding Documents is the office of the Engineer: Sickels & Associates, 833 Kings Highway, Woodbury, New Jersey 08096, (856) 848-6800. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays, and may obtain copies of the Bidding Documents from the Issuing Office as described within this notice. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Note: Bids received from Bidders who have not purchased the Bidding Documents from the Issuing Office will be rejected. Bids must be submitted on the proposal forms provided within the documents in the manner designated therein. Bids must be enclosed in a sealed envelope bearing the bidder's name and address labeled "Bid for Gateway Pumping Station Standby Power System Improvements" and addressed to the Carneys Point Sewerage Authority, 303 Harding Highway, Carneys Point, NJ 08069, Attention: Authority Clerk. If forwarded by mail, the sealed envelopes containing the bid must be enclosed in another envelope addressed to the Carneys Point Sewerage Authority. This project is being bid in accordance with local public contract bid laws and Bidders shall comply with the Local Contracts Law, N.J.S.A. 40A:11-1 et seq. Bids must be accompanied by a Certificate of Surety from an acceptable surety and a bid security in the form of a certified check, cashier's check or bid bond payable to the Carneys Point Sewerage Authority in the amount of ten percent (10%) of the total bid amount but not in excess of $20,000.00. The successful bidder shall also comply with the provisions of the New Jersey Prevailing Wage Act, Chapter 150 of the Laws of 1963, effective January 1, 1964. Pursuant to N.J.A.C. 10:5-33: "Bidders are required to comply with the requirements of P.L. 1975, c.127." This includes compliance with Affirmative Action requirements pursuant to Public Law 1975 C. 127 (N.J.A.C. 17:27) as revised and amended to date. The successful bidder must furnish a Performance Bond and Payment Bond, each in the amount equal to one hundred percent (100%) of the contract price. Said bonds must be in a form acceptable to the Carneys Point Sewerage Authority and be issued by a surety authorized to do business in the State of New Jersey. The Contracts, if awarded, will be to the lowest responsible bidder whose bid proposal conforms to the requirements set forth in the Contract Documents. The Carneys Point Sewerage Authority will award the Contract or reject the bids within sixty (60) municipal days after the date of the bid opening. Should there be any reason the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Pennsville Sewerage Authority and the bidder. The Owner and the Engineer reserve the right to require a complete financial and experience statement from the prospective bidders showing that they have satisfactorily completed work of the nature required before furnishing proposal forms or specifications, or before awarding the contract. The Owner reserves the right to reject any and all bids in whole or in part, and to waive any informalities or minor defects therein, should it be deemed in the best interest of the Owner, in accordance with Local Public Contracts Law and will determine the lowest responsible and responsive bidder in compliance with N.J.S.A. 40A:11-24. Question Deadline 09/17/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$143,795.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

26

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders, Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Soil Stabilization, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Hooks

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
167
Bidding Soon
2,729
All Active Projects
1,169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 28, 2024

img_map_placeholder

To Be Determined, Carneys Point, NJ

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Gateway Pumping Station Standby Power System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.