BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Livermore, California. Completed plans call for site work for a municipal facility.

Contractor shall provide services in support of the City of Livermore Decorative Fence Repair and Replacement Program. Services shall include, but are not limited to, furnishing all labor, materials, supplies and equipment to perform decorative fence repair and replacement including permitting, demolition, proper removal and disposal of fences and masonry, traffic and pedestrian control, temporary fencing, erosion control, fence construction, fence finishing, coordination with private property owners and other related tasks. Work shall be conducted in accordance with the City's Standard Construction Details and Standard Specifications. Reference Number 0000360339 The Project is located on the west side of Holmes Street, from Catalina Drive to El Caminito, and is described as follows: removal of old fence and pilasters and installation of new 7' redwood fence on the property line. Location and Description. The Project is located at the west side of Holmes Street, from Catalina Drive to El Caminito, and is described as follows: removal of old fence and pilasters and installation of new 7' redwood fence on property line. General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - License Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % - Warranty 15 % -- The successful bidder will be required to provide performance and payment bonds each in the amount of 100% of the Contract Price and a Warranty Bond in the amount of 15% of the Contract Price. Each Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included in the Contract Documents. Time for Completion. The planned timeframe for Substantial Completion of construction of the Project is 50 Working Days after the commencement date stated in the Notice to Proceed. Final Completion of the Project is planned to be 20 Working Days after the date of Substantial Completion. Question Deadline 09/17/2024 at 2:00 PM PT Questions are submitted online No ,Questions regarding the Project, the bid procedures, or the meaning or intent of the Contract Documents must be submitted in writing to the Engineer at (Thomas Purcell, Special Projects, City of Livermore, 1052 S. Livermore Ave. Livermore, CA 94550 and thpurcell@livermoreca.gov). Construction Cost. The Engineer's estimated construction cost is: $400,000. * City reserves the right to reject any and all bids and to waive any non-substantive irregularities.

Post-Bid

Municipal

$400,000.00

Public - City

Site Work

5

15

4

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
185
Bidding Soon
3,485
All Active Projects
1,439
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 24, 2024

October 24, 2024

img_map_placeholder

Holmes St, Livermore, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.