Site work and renovation of a civil project in Yaphank, New York. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

The work consists of the following: Installation of approximately 5,600 linear feet office main in Town of Smithtown right-of-way. The purpose of the project is improvements to the Suffolk County Sewer District (SCSD) No. 6 Pump Station 3 and installation of approximately 12,500 LF of force main. 14-Inch Diameter PVC DR-18 Force Main 4-Foot Diameter Precast Concrete Terminal Forcemain Manhole 5-Foot Diameter Drain Manhole for Force Main 14-Inch Diameter Force Main Ductile Iron Inline Cleanouts 20-Inch Diameter DR-11 Carrier Pipe with 14-Inch Diameter PVC DR-18 Force Main 14-Inch Diameter Ductile Iron 11.25 Degree Elbow Fitting 14-Inch Diameter Ductile Iron 22.5 Degree Elbow Fitting 14-Inch Diameter Ductile Iron 45 Degree Elbow Fitting 1-1/2" Mill & Overlay When creating profile, ensure that you select NIGP codes 909, 010, 912, 913, 925, and 968 which will allow you to view the appropriate documents and receive future e-mails about Lettings/Capital Projects. You are responsible for obtaining and printing all appropriate Contract Documents. You are also responsible for checking the site frequently to ensure that you have all addenda. Note that there is no fee to create a user profile or to obtain documents. Questions for user login should be directed to the Suffolk County Department of Public Works IT division at (631) 852-4115. Eligible bidders must have registered online to be eligible to submit a responsible bid. Contract S - Sewer Construction Note: This Project is to be bid as a multi prime project. Bidders shall submit with their bids, a separate sealed list that names each subcontractor that the bidder will use to perform work on the contract, and the agreed-upon amount to be paid to each as applicable, for (a) plumbing and gas fitting (Le., Plumbing Work), (b) steam heating, hot water heating, ventilating and air conditioning apparatus (i.e., HVAC Work which includes fire sprinkler) and (c) electric wiring and standard illuminating fixtures (i.e., Electrical Work). The apparent low bidder's subcontract information will be opened and read aloud at the bid opening. Bids shall be accompanied by a certified check or bid bond in an amount not less than five percent (5%) of the total Base Bid, made payable to the Suffolk County Comptroller. This bid bond will be held as a guarantee that in the event the bid is accepted and contract awarded to the Bidder, the contract will be duly executed and properly secured. Awards will be made to the lowest responsive and responsible Bidder in conjunction with Section A4-14 of the Suffolk County Administrative Code establishing an optional ten percent (10%) local (Nassau/ Suffolk) preference program for Suffolk County contracts. The bids shall be delivered in person, by the Bidder or his agent, at the time and place stated. NOTE: Notice to Bidders and Bid Results are posted electronically. Bid Results will not be given out over the telephone. You are requested to access online for this information. If you are not in attendance at the bid opening, please be patient while we process and post the results. Results will typically be posted within 24 hours after the bid opening Please note that all construction projects over $250,000 advertised after July 17, 2008 will be subject to training requirements pursuant to Section 220-h of the NYS Labor Law. Please note that all construction contracts involving construction, reconstruction, improvement, rehabilitation, installation, alteration, renovation, demolition of, or otherwise providing for any building, facility or physical structure of any kind with a value in excess of $250,000 will be subject to Apprenticeship Training Program requirements pursuant to Article 23, Section 816b of the NYS Labor Law and Suffolk County Resolution No. 1866 - 2014, specifically requiring graduate of apprentice(s) in the trade(s) called for within the construction contract within specified time period preceding the bid date of project. The Commissioner of Public Works reserves the right to reject any and all bids. Any questions regarding this project shall be directed to Greg Levasseur, P.E. (Project Manager) via email at glevasseur@h2m.com and cc Janice McGovern, P.E. at Janice.mcgovefn@suffolkcountvnv.gov., George Baxter, P.E. at George.Baxter@suffolkcountvny.gov., John Berchtold, P.E. at john.berchtold@suffolkcountyny.gov. Completion- 540 calendar days MBE (12%), WBE (5%) The work includes, but is not limited to, the following: 1. Sheeting, bracing, excavation, and soil erosion protection. 2. Installation of sanitary force main. 3. Equipment start-up and testing. 4. Work zone traffic control. 5. Rough and final grading, and pavement restoration. 6. Restoration of curbs, gutters, and sidewalks. 7. Restoration of landscaped areas. 8. Protection of existing utilities. 9. Material testing. 10. Debris removal, street sweeping, and daily and final cleanup. 11. Coordination with utility companies and property owners as necessary to schedule connection of services, and mangement of the installation. 12. Site utilization and management so as not to disrupt the daily operation of the businesses and residential houses along the route of the work. 13. Product and equipment storage and handling requirements. 14. Site safety in accordance with all applicable federal, state and local regulations. 15. Excavation, backfill, and removal and offsite disposal of surplus and/or unsuitable materials. 16. Project submittals, meetings, professional photographs, testing services, work plans, schedules, shop drawings, close out procedures and documents, as-built drawings, and final decomissioning of the work shall be provided as required by the Contract.

Post-Bid

Water / Sewer

$420,000.00

Public - County

Renovation, Site Work

43

31

34

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Electricity, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Operation Data, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Pipe and Tube Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders, Membrane Roofing, Fluid-Applied Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Plastic Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Fixed Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Flooring, Painting and Coating, Painting, Decorative Finishing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Split-System Air-Conditioners, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Rigid Paving Rehabilitation, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Topsoil Placement and Grading
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
169
Bidding Soon
4,240
All Active Projects
1,733
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

October 28, 2024

img_map_placeholder

To Be Determined, Yaphank, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.