BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Killeen, Texas. Contact the soliciting agency for additional information.

1. Description of Services: a. Contractor shall conduct an initial PM, essential services, semi-annual service, and annual PM services for 4 buildings, as described below in this statement of work. 2. Initial and Essential Services: a. Contractor shall provide essential services to include guaranteed 4-hour on-site emergency response, 7 days/week, 24 hours/day. b. Contractor shall include POC's and detail instructions for requesting emergency services. c. Contractor shall include 100% corrective labor and travel coverage 7 days/week, 24 hours/day. Does not include labor for full-string replacement. d. Contractor shall include battery recycling as required, with documentation meeting EPA requirements. Contractor shall be factory trained Battery Specialist or Customer Engineers and able to service the UPS (Liebert, VERTIV, or EATON) in each of the buildings. See descriptions of Equipment to be serviced below. e. Contractor shall perform an initial PM visit; during the initial visit an Annual Service PM shall be performed. f. Contractor shall conduct required single jar replacement service for lead acid batteries to include freight, labor, and disposal of batteries. Single jar replacement service is necessary the battery string is not in overall good health and the battery string is beyond expected service years or has had excessive single jar replacements that would make the string unstable. g. Contractor shall refurbish cell connections as deemed necessary by the detailed inspection report. h. Contractor shall provide a detailed written report noting any deficiencies and corrective actions needed, taken and/or planned following both normal service and emergency response. i. Contractor must return unit to operational service with normal load then measure and verify display indications following both normal service and emergency response. 3. Semi-Annual Service a. Contractor shall inspect the appearance and cleanliness of the battery and the battery room. Clean normal jar top dirt accumulation (to be done only with battery offline). b. Contractor shall measure and record the total battery float voltage and charging current. c. Contractor shall measure and record the overall AC ripple voltage. d. Contractor shall measure and record the overall AC ripple current. e. Contractor shall visually inspect the jars and covers for cracks and leakage. f. Contractor shall visually inspect for evidence of corrosion. g. Contractor shall measure and record the ambient temperature. h. Contractor shall verify the integrity of the battery rack/cabinet. i. Contractor shall measure and record 100% of the jar temperatures. j. Contractor shall measure and record the float voltage of all jars. k. Contractor shall measure and record all internal ohmic readings. l. Contractor shall refurbish cell connections as deemed necessary by the detailed inspection report. m. Contractor shall provide a detailed written report noting any deficiencies and corrective action needed, taken and/or planned. 4. Annual Service Includes All the Above, Plus a. Contractor shall perform original equipment manufacturer (OEM) maintenance/service to include checking capacitors, fans, and firmware updates if necessary. b. Contractor shall re-tighten all battery connections to the battery manufacturer's specifications, if required. Refer to the manufacturer's literature to determine if retightening is required. c. Contractor shall measure and record all battery connection resistances in micro-ohms, when applicable. All questions must be submitted no later than 2:00 PM Central Time on September 02, 2024 to both the Contract Specialist and the Contracting Officer at the above email addresses. E-mail is the preferred method for questions. Requests shall be marked with solicitation number W91151-24-Q-0030. Period of Performance: 23 September 2024 to 22 September 2025

Post-Bid

Military

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
24
Bidding Soon
1,546
All Active Projects
578
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.