Site work for a civil project in Fortuna, California. Working plans call for site work for a bridge / tunnel; and water / sewer project.

** As of September 20,2024 no bids received. No definite date for the rebid.** Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Brendan Byrd at bbyrd@ci.fortuna.ca.us. Bidders should submit any such written inquiries at least five Working Days before the scheduled bid opening. Questions received any later might not be addressed before the bid deadline. Project Information. 2.1 Location and Description. The Project is located at various locations throughout the City of Fortuna In general, the Contractor shall provide all materials and labor in order to line each culvert with a structural PVC liner, such as Dynaliner Thermoform, or equivalent. Each culvert shall be prepped as necessary with grout or other treatments at the contractor's expense in order for the PVC liner to be installed. The project locations and anticipated quantities for each location is listed below. 3rd Street Off-ramp: Grout repair and line approximately 110-linear feet of 30" diameter corrugated metal pipe culvert. 1118 Elizabeth Barcus Way: Grout and line approximately 42-linear feet of 24" diameter corrugated metal pipe culvert. 256 Sunrise Court: Line approximately 120-linear feet of 36" diameter corrugated metal pipe culvert. Rohnerville Road at 2600 Newburg: Grout and line approximately 230-linear feet of 18" diameter corrugated metal pipe culvert. At each location, the City requires that the contractor provide all work in order to install the liner, including but not limited to traffic control, water management, and temporary facilities. The City will provide to the contractor water from the nearest hydrant using a City-issued hydrant meter (at no expense), or the contractor can obtain water from the City's cooperation yard in a water truck or trailer at no cost Each stormdrain pipe listed above was camera inspected in 2023. The videos for each inspection can be requested by emailing the City at mcrisler@ci.fortuna.ca.us, with a copy to bbyrd@ ci.fortuna.ca.us. Time for Final Completion. Project must be completed before December 31, 2024. License and Registration Requirements. 3.1 License. This Project requires a valid California contractor's license for the following classification(s): Class A 3.2 DIR Registration. City may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations ("DIR") to perform public work pursuant to Labor Code 1725.5, subject to limited legal exceptions. Bid Security. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, valid Certificates of Reported Compliance as required under the California Air Resources Board's In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR 2449 et seq.) ("Off-Road Regulation"), if applicable, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award. Prevailing Wage Requirements. 6.1 General. Pursuant to California Labor Code 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. 6.2 Rates. The prevailing rates are on file with the City and are available online . Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. 6.3 Compliance. The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code 1771.4. Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. Subcontractor List. Each Subcontractor must be registered with the DIR to perform work on public projects. Each bidder must submit a completed Subcontractor List form with its Bid Proposal, including the name, location of the place of business, California contractor license number, DIR registration number, and percentage of the Work to be performed (based on the base bid price) for each Subcontractor that will perform Work or service or fabricate or install Work for the prime contractor in excess of one-half of 1% of the bid price, using the Subcontractor List form included with the Contract Documents.

Final Planning

Bridges / Tunnels

$300,000.00

Public - City

Site Work

5

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
56
All Active Projects
30
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.