Site work and paving for a sidewalk / parking lot in Atlanta, Georgia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

https://atlanta.urbanize.city/post/new-beltline-westside-paper-spur-trail-path-photos Following several years of planning, fundraising, and construction, a connective multipurpose trail dubbed "The Spur" has arrived. It's just not technically open yet. Snaking for about 3/4 of a mile in Howell Station, the Westside Paper Spur Trail extends north from the Westside Beltline Connector, providing a protected multi-use trail link between downtown and hundreds of residences and new businesses along the West Marietta Street corridor. But despite its barricade-free appearances, The Spur remains under construction and isn't open to the public, according to Pete Pellegrini, PATH Foundation project manager. "The contractor is in some of the final stages of construction and believes this segment should be open by the year's end," Pellegrini wrote via email this week. That would mean The Spur is delivering ahead of schedule. Initial projections when the project broke ground in March forecasted the trail's opening as late as May next year. Approaching the recently installed 65-foot-long bridge in the Howell Station neighborhood. Contributed photo At the south end, The Spur starts where the Westside Beltline Connector meets Joseph E Lowery Boulevard. It passes directly next to the Puritan Mill district, expanded QTS data center facilities, and the new mixed-use Westside Paper district--a remake of 1950s warehouses--before ending near King Plow Arts Center. In between, a 65-foot-long bridge that's necessary for steep topography between properties has also been installed. The Spur is considered a collaborative effort between the City of Atlanta, Upper Westside Community Improvement District, and PATH. Adjacent property owners donated all of the necessary easements for trail construction, according to project leaders. The Spur has been on the radar of Atlanta alternate-transportation enthusiasts since 2020, when business owners, stakeholders, and nearby residents pinpointed it as a priority for boosting the area's multimodal infrastructure. The Upper Westside CID also incorporated the trail into its Upper Westside Masterplan that year. How the new Westside Paper Spur Trail passes behind the mixed-use district (at left) of the same name today, with QTS' expanded data center at right. Contributed photo The Spur may seem open, but it's technically closed to the public for now, per PATH Foundation officials. Contributed photo The Upper Westside CID hopes to eventually expand the pathway so that it ties into the Brady Avenue cycletrack and the mainline Beltline loop, located just to the west, officials have said. The CID group picked Hasbun Construction to build The Spur following a public bidding process last year. Funding for The Spur was sourced from the $750-million Moving Atlanta Forward program approved by voters two years ago, the Howell Station Neighborhood Association, the Upper Westside CID, and other sources. Greta DeMayo, PATH executive director, has called The Spur part of a project portfolio her agency is aiming to deliver by 2026 to improve off-street connections and vibrancy around the city. Head up to the gallery for a quick tour (via reader-submitted photos) of The Spur's current construction progress--no pedaling required. PATH Foundation/Upper Westside CID Looking north, an overview of the .73-mile multi-use pathway, with the Westside Paper district ahead at right. PATH Foundation/Upper Westside CID __________________ This project is a construction of a 0.52 mile, 10 wide concrete multi-use trail beginning on Lena St NW and ending at the James P. Brawley Dr NW and M.L.K. Jr Dr SW intersection. The trail will offer the Westside communities a safe and convenient way to travel from Northside Drive NW to the Ashby MARTA Station and, by way of the already completed section of trail along Lena Street, to the Westside Atlanta Beltline. PN - IFB/CON/DOT/2407-1250015

Bid Results

Sidewalks / Parking Lot

$2,070,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
56
Bidding Soon
1,492
All Active Projects
507
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.