BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement and renovation of a mixed-use development in Hopewell Junction, New York. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

**As of November 01, 2024, the project has not yet been awarded. The anticipated date for award is not yet determined. 2023 District Wide Renovations Phase 2 Bid Hazardous Material Abatement - Contract HM.2 If the District closes in the event of inclement weather, Bid & RFP openings will be postponed until the next business day. Roy C. Ketcham High School 99 Myers Corners Road, Wappingers Falls S.E.D. Proj. #13-21-01-06-0-012-039 John Jay Senior High School 2012 Route 52, Hopewell Junction S.E.D. Proj. #13-21-01-06-0-020-043 Van Wyck Junior High School 10 Hillside Lake Road, Wappingers Falls S.E.D. Proj. #13-21-01-06-0-017-027 Wappingers Junior High School 30 Major MacDonald Way, Wappingers Fall S.E.D. Proj. #13-21-01-06-0-004-036 Fishkill Elementary School 20 Church Street, Fishkill S.E.D. Proj. #13-21-01-06-0-005-021 Sheafe Road Elementary School 287 Sheafe Road, Wappingers Falls S.E.D. Proj. #13-21-01-06-0-018-022 Vassar Road Elementary School 174 Vassar Road, Poughkeepsie S.E.D. Proj. #13-21-01-06-0-008-026 Main Garage No.1 55 Major MacDonald Way, Wappingers Falls S.E.D. Proj. #13-21-01-06-5-007-009 Project Locations: Roy C. Ketcham High School (RCK) 99 Myers Corners Road, Wappingers Falls, NY John Jay High School (JJ) 2012 Route 52, Hopewell Junction, NY Wappingers Jr High School 30 Major MacDonald Way, Wappingers Falls, NY Fishkill Elementary School (FE) 20 Church Street, Fishkill, NY Sheafe Road Elementary School (SR) 287 Sheafe Road, Wappingers Falls, NY Vassar Road Elementary School (MC) 174 Vassar Road, Poughkeepsie, NY Main Garage No. 1/Transportation Offices Major MacDonald Way, Wappingers Falls, NY Question Deadline 09/23/2024 Prospective bidders may request clarification of the bid documents in writing addressed to Rhinebeck Architecture & Planning PC, attention Brian Gottschalk via e-mail Gottschalk.Brian@WSEinc.com. No interpretations of the meaning of the plans, specifications or other contract documents will be made to any bidder orally. Every question for such interpretations shall be in writing using the correct form, and must be received One (1) week prior to bid date in order to be considered. B. Temporary facilities and controls in the Hazardous Materials Work Contract include, but are not limited to the following: 12. Temporary facilities and controls that are not otherwise specifically assigned to other contracts. 1. Unpiped temporary toilet fixtures, wash facilities, and drinking water facilities, including disposable supplies. 2. Temporary enclosure for building exterior, except as indicated. 3. Excavation support and protection, unless required solely for the Work of another contract. 4. Special or unusual hoisting requirements for construction activities, including hoisting loads in excess of 2 tons, hoisting material or equipment into spaces below grade, and hoisting requirements outside building enclosure. 5. General waste disposal facilities. 6. Pest control. 7. Temporary fire-protection facilities. 8. Barricades, warning signs, and lights. 9. Security enclosure and lockup. 10. Environmental protection. 11. Restoration of Owner's existing facilities used as temporary facilities. C. Work in the Hazardous Materials Work Work Contract includes (furnish and install unless otherwise noted), but is not limited to, the following: 1. Include removal of hazardous containing materials RCK and John Jay High Schools, Van Wyck and Wappingers Junior High Schools. 2. Coordinate removal of asbestos containing roofing openings with GW and HVAC contractors at Van Wyck Roof. 3. GW.2 General Work contractor will remove classroom cabinetry down to base. 4. Include opening sections of toilet room chase wall at RCK boys and girls toilet room to inspect for hazardous materials. Include demolition and containment of walls/room if materials are found. 5. Include removal of VAT materials up to face of cabinetry at classroom locations where cabinetry is to remain. 6. Exclude: Work identified under other contracts.

Award

Educational

$279,665.00

Public - County

Asbestos Abatement, Renovation, Site Work

135

24

58

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
431
Active Projects
237
Bidding Soon
4,258
All Active Projects
1,915
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 19, 2024

img_map_placeholder

Multiple Locations, Hopewell Junction, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.