BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2025 at 7:00 PM

Updated January 14, 2025

Site work for a bridge / tunnel in Birch Creek, Wisconsin. Completed plans call for site work for a bridge / tunnel.

Proposal for construction and installation of Tealey Creek Snowmobile Trail Bridge. The County Department of Land Conservation & Forest Management is seeking proposals and corresponding bids for the removal of the existing bridge and the design, professional engineering, construction and installation of a new snowmobile trail bridge that meets WDNR specifications, including appropriate pilings and a 25,000 lb weight limit Project Completion: June 1, 2026. Chippewa County reserves the right to reject any and all bids. The method of Contractor Selection has not been Determined at this time. Performance and Payment Bonds - Submit Performance Bond and Payment Bond on AIA Document 312 Performance Bond or Payment Bond OR on forms provided by the Surety. THIS PROJECT WILL REQUIRE A PERFORMANCE BOND FOR THE AMOUNT OF THE PROJECT, BUT WILL NOT REQUIRE A BID BOND. Question Deadline 09/10/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to the Owner in writing. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda to all parties who are known to have received a complete set of Bidding Documents. Copies of Addenda will be made available for inspection wherever Bidding Documents are on file for that purpose. Questions received less than 10 days prior to the date of opening of bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Bridges / Tunnels

$100,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
22
Bidding Soon
364
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

September 22, 2025

Project location map

290th Ave & County Hwy E, Birch Creek, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.