BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Bakersfield, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of November 14, 2024 projects has not been awarded . Project is scheduled to be awarded on November 20, 2024.** Municipal Meeting 10/09/2024 Expected Date of City Council Approval Estimated Bid Value 659,000.00 Question Deadline 09/13/2024 at 12:00 PM PT Final Questions or Comments Due Direct questions for clarification of this Invitation to Bid: Olimpia Frederick, Purchasing Officer Telephone: 6613263914 Fax: 6618522100 E-Mail: ofrederick@bakersfieldcity.us The work to be done shall conform to the following specifications: 1. Furnishing and placing the required forms. 2. Furnishing and placing expansion joints where required. 3. Placing steel frame and cover and bar reinforcement for catch basins. 4. Furnishing, placing, and finishing cement concrete for curbs, gutters, sidewalks, catch basins and cross drains as specified. 5. Wing walls in connection with part-circle culverts will be paid for as standard curb. 6. City forces will remove broken or defective curb, gutter, or sidewalk below sub-grade elevation. 7. City forces will supply Class 2 Base for fill material on job site, Contractor to hydrate, move, and place material as needed. 8. Contractor is responsible for finishing sub-grade elevation to 90% compaction prior to placing concrete. 9. Contractor is to notify Project Manager for inspection of sub-grade prior to placing concrete. 10. Concrete placed without sub-grade inspection shall be removed and replaced by Contractor at their own expense. 11. Contractor to remove all debris from job site daily, including washout material. 12. Contractor to pour in a continuous fashion, no skipping sections unless approved by the City's Project Manager 13. Contractor and City Project Manager shall meet and agree on quantities prior to Contractor invoicing. 14. Contractor to ensure all work has proper drainage, any standing water areas will be removed and replaced by Contractor at their own expense Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A No

Bid Results

Sidewalks / Parking Lot

$760,958.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
19
Bidding Soon
370
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

October 17, 2024

img_map_placeholder

Multiple Locations, Bakersfield, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.