BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Lake Elsinore, California. Conceptual plans call for the renovation of a municipal facility.

City Hall Council Chamber Audiovisual Infrastructure Design. Question Deadline 09/09/2024 at 4:00 PM PT Online Q&A Yes Scope of Services The general objectives and goals of this project include: i. Clear, high resolution audiovisual capture and playback, both within the Chambers itself and via the various broadcast methods. ii. Robust, end-to-end, fault-tolerant audiovisual infrastructure that minimizes points of failure. iii. Rapid recovery and troubleshooting when failures occur in order to keep downtime to an absolute minimum. The method of Contractor Selection has not been Determined at this time. The following items are to be considered by a prospective qualified firm as integral to the successful completion of this project and will need to be included in any future design proposal. i. Audio 1. Microphones (both wired and wireless) 2. Speakers (both house and monitor) 3. Audio processing and control 4. Assistive listening and ADA related requirements ii. Video 1. Cameras with remote PTZ control 1. Electronic, remotely changeable name plates for council/committee members and staff. 2. Public speaker sign-up kiosk. 3. Automation and room control functionality 4. Integration with meeting management, request to speak and voting software (PrimeGov OneMeeting). v. Program Production 1. Live Audio/Video mixing of cameras, house audio and other sources 2. Graphics insertion and titling 3. Output to audience sources (Online/streaming, Public Access channels, etc.) 4. Scheduled programing playback for broadcast output. vi. Support and Maintenance 1. Provide training to city staff and contractors on operation of installed equipment 2. Create operations manual and troubleshooting guide 3. Provide on-call support in case of failures

Conceptual

Municipal

$300,000.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
112
Bidding Soon
2,428
All Active Projects
1,089
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2024

img_map_placeholder

130 S Main St, Lake Elsinore, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.